Access the full text.
Sign up today, get DeepDyve free for 14 days.
ZahirAbbas Khaswala, S. Irani (2001)
Value Network Mapping (VNM): Visualization and Analysis of Multiple Flows in Value Stream Maps
J. Womack, Daniel Jones (1996)
Lean Thinking: Banish Waste and Create Wealth in Your Corporation
Y. Lian, H. Landeghem (2002)
An application of simulation and value stream mapping in lean manufacturing
Jin Zhou, S. Irani (2003)
A New Flow Diagramming Scheme for Mapping and Analysis of Multi-Product flows in a FacilityTrans. SDPS, 7
Allard Droste (2007)
Lean thinking, banish waste and create wealth in your corporationAction Learning: Research and Practice, 4
D. Veeramani, K. Mani (1996)
A polynomial-time algorithm for optimal clustering in a special class of {0, l} -matricesInternational Journal of Production Research, 34
P. Hines, Nick Rich (1997)
The seven value stream mapping toolsInternational Journal of Operations & Production Management, 17
(1996)
Optimal clustering in vertex-tree graphic matrices
P. Hines, Nick Rich, J. Bicheno, D. Brunt, David Taylor, Christian Butterworth, J. Sullivan (1998)
Value Stream ManagementThe International Journal of Logistics Management, 9
M. Emiliani (2000)
Cracking the code of businessManagement Decision, 38
O. Offodile, J. Grznar (1997)
Part family formation for variety reduction in flexible manufacturing systemsInternational Journal of Operations & Production Management, 17
H. Selim, Reda Aal, Araby Mahdi (2003)
Formation of machine groups and part families: a modified SLC method and comparative studyIntegrated Manufacturing Systems, 14
Thomas McDonald, E. Aken, A. Rentes (2002)
Utilising Simulation to Enhance Value Stream Mapping: A Manufacturing Case ApplicationInternational Journal of Logistics Research and Applications, 5
(1999)
Learning to See: Value Stream Mapping to Add Value and Eliminate Muda
In this paper, an innovative framework to apply Value Stream Mapping to products with complex Bill of Materials is presented. Value Stream Mapping is one of the best tools to map a process and to identify its main criticalities. Unfortunately, it can be effectively applied to linear systems only. When the manufacturing process is complex with flows merging together, Value Stream Mapping cannot be used straightforwardly. Thus, the main objective of this work is to solve this limitation so that lean production can be enhanced in complex systems too. The proposed approach is based on seven iterative steps and integrates Value Stream Mapping with other tools typical of industrial engineering. The basic idea is to execute a preliminary analysis to identify the ‘critical production path’ using the Temporized Bill of Material. Then, improvements are made considering all possible sharing with other secondary paths as possible constraints. Once the critical path has been optimized, a new path may become critical. Thus, the analysis proceeds iteratively until the optimum is reached and the Work In Process level has decreased under a desired value. A case study taken from a real setting environment is finally presented to assess the validity of the methodology proposed here.
International Journal of Production Research – Taylor & Francis
Published: Sep 15, 2006
Keywords: Lean manufacturing; Routing; Temporized bill of material; Value stream mapping
Read and print from thousands of top scholarly journals.
Already have an account? Log in
Bookmark this article. You can see your Bookmarks on your DeepDyve Library.
To save an article, log in first, or sign up for a DeepDyve account if you don’t already have one.
Copy and paste the desired citation format or use the link below to download a file formatted for EndNote
Access the full text.
Sign up today, get DeepDyve free for 14 days.
All DeepDyve websites use cookies to improve your online experience. They were placed on your computer when you launched this website. You can change your cookie settings through your browser.