Get 20M+ Full-Text Papers For Less Than $1.50/day. Start a 14-Day Trial for You or Your Team.

Learn More →

Erratum to: Markov processes on Riesz spaces

Erratum to: Markov processes on Riesz spaces Positivity (2012) 16:393 DOI 10.1007/s11117-011-0132-x Positivity ERRATUM Jessica J. Vardy · Bruce A. Watson Published online: 13 July 2011 © Springer Basel AG 2011 Erratum to: Positivity DOI 10.1007/s11117-011-0121-0 In Definition 3 of this article, a condition has been omitted. Definition 3 should read (i.e. the italicized words below were omitted): Definition 3 Let E be a Dedekind complete Riesz space with conditional expectation T and weak order unit e = Te.Let P and Q be band projections on E , we say that P and Q are T -conditionally independent with respect to T if TP TQe = TPQe = TQ TP e. (1) We say that two Riesz subspaces E and E of E , containing R(T ),are T -conditionally 1 2 independent with respect to T if all band projections P , i = 1, 2, in E with P e ∈ E , i = 1, 2, are T -conditionally independent with respect to T . i i Acknowledgments We thank Prof. J.J. Grobler for alerting us to the omission corrected herein. The online version of the original article can be found under doi:10.1007/s11117-011-0121-0. J. J. Vardy · B. A. Watson (B) Centre for Applicable http://www.deepdyve.com/assets/images/DeepDyve-Logo-lg.png Positivity Springer Journals

Erratum to: Markov processes on Riesz spaces

Positivity , Volume 16 (2) – Jul 13, 2011

Erratum to: Markov processes on Riesz spaces

Abstract

Positivity (2012) 16:393 DOI 10.1007/s11117-011-0132-x Positivity ERRATUM Jessica J. Vardy · Bruce A. Watson Published online: 13 July 2011 © Springer Basel AG 2011 Erratum to: Positivity DOI 10.1007/s11117-011-0121-0 In Definition 3 of this article, a condition has been omitted. Definition 3 should read (i.e. the italicized words below were omitted): Definition 3 Let E be a Dedekind complete Riesz space with conditional expectation T and weak order unit e = Te.Let P and Q...
Loading next page...
 
/lp/springer_journal/erratum-to-markov-processes-on-riesz-spaces-gNfo5BzoBa

References (0)

References for this paper are not available at this time. We will be adding them shortly, thank you for your patience.

Publisher
Springer Journals
Copyright
Copyright © 2011 by Springer Basel AG
Subject
Mathematics; Calculus of Variations and Optimal Control; Optimization; Fourier Analysis; Operator Theory; Econometrics; Potential Theory
ISSN
1385-1292
eISSN
1572-9281
DOI
10.1007/s11117-011-0132-x
Publisher site
See Article on Publisher Site

Abstract

Positivity (2012) 16:393 DOI 10.1007/s11117-011-0132-x Positivity ERRATUM Jessica J. Vardy · Bruce A. Watson Published online: 13 July 2011 © Springer Basel AG 2011 Erratum to: Positivity DOI 10.1007/s11117-011-0121-0 In Definition 3 of this article, a condition has been omitted. Definition 3 should read (i.e. the italicized words below were omitted): Definition 3 Let E be a Dedekind complete Riesz space with conditional expectation T and weak order unit e = Te.Let P and Q be band projections on E , we say that P and Q are T -conditionally independent with respect to T if TP TQe = TPQe = TQ TP e. (1) We say that two Riesz subspaces E and E of E , containing R(T ),are T -conditionally 1 2 independent with respect to T if all band projections P , i = 1, 2, in E with P e ∈ E , i = 1, 2, are T -conditionally independent with respect to T . i i Acknowledgments We thank Prof. J.J. Grobler for alerting us to the omission corrected herein. The online version of the original article can be found under doi:10.1007/s11117-011-0121-0. J. J. Vardy · B. A. Watson (B) Centre for Applicable

Journal

PositivitySpringer Journals

Published: Jul 13, 2011

There are no references for this article.