Delay Analysis of All-Optical Packet-Switching Ring and Bus Communications Networks

Delay Analysis of All-Optical Packet-Switching Ring and Bus Communications Networks We study the delay performance of all-optical packet communication networks configured as ring and bus topologies employing cross-connect switches (or wavelength routers). Under a cross-connect network implementation, a packet experiences no (or minimal) internal queueing delays. Thus, the network can be implemented by high speed all-optical components. We further assume a packet-switched network operation, such as that using a slotted ring or bus access methods. In this case, a packet's delay is known before it is fed into the network. This can be used to determine if a packet must be dropped (when its end-to-end delay requirement is not met) at the time it accesses the network. It also leads to better utilization of network capacity resources. We also derive the delay performance for networks under a store-and-forward network operation. We show these implementations to yield very close average end-to-end packet queueing delay performance. We note that a cross-connect network operation can yield a somewhat higher queueing delay variance levels. However, the mean queueing delay for all traffic flows are the same for a cross-connect network operation (under equal nodal traffic loading), while that in a store-and-forward network increases as the path length increases. For a ring network loaded by a uniform traffic matrix, the queueing delay incurred by 90% of the packets in a cross-connect network may be lower than that experienced in a store-and-forward network. We also study a store-and-forward network operation under a nodal round robin (fair queueing) scheduling policy. We show the variance performance of the packet queueing delay for such a network to be close to that exhibited by a cross-connect (all-optical) network. http://www.deepdyve.com/assets/images/DeepDyve-Logo-lg.png Photonic Network Communications Springer Journals

Delay Analysis of All-Optical Packet-Switching Ring and Bus Communications Networks

Loading next page...
 
/lp/springer_journal/delay-analysis-of-all-optical-packet-switching-ring-and-bus-JMDRqRxzTt
Publisher
Kluwer Academic Publishers
Copyright
Copyright © 2001 by Kluwer Academic Publishers
Subject
Computer Science; Computer Communication Networks; Electrical Engineering; Characterization and Evaluation of Materials
ISSN
1387-974X
eISSN
1572-8188
D.O.I.
10.1023/A:1011412517255
Publisher site
See Article on Publisher Site

References

  • Survivable all-optical cross-connect meshed-ring communications networks
    Rubin, I.; Ling, J.

You’re reading a free preview. Subscribe to read the entire article.


DeepDyve is your
personal research library

It’s your single place to instantly
discover and read the research
that matters to you.

Enjoy affordable access to
over 12 million articles from more than
10,000 peer-reviewed journals.

All for just $49/month

Explore the DeepDyve Library

Unlimited reading

Read as many articles as you need. Full articles with original layout, charts and figures. Read online, from anywhere.

Stay up to date

Keep up with your field with Personalized Recommendations and Follow Journals to get automatic updates.

Organize your research

It’s easy to organize your research with our built-in tools.

Your journals are on DeepDyve

Read from thousands of the leading scholarly journals from SpringerNature, Elsevier, Wiley-Blackwell, Oxford University Press and more.

All the latest content is available, no embargo periods.

See the journals in your area

Monthly Plan

  • Read unlimited articles
  • Personalized recommendations
  • No expiration
  • Print 20 pages per month
  • 20% off on PDF purchases
  • Organize your research
  • Get updates on your journals and topic searches

$49/month

Start Free Trial

14-day Free Trial

Best Deal — 39% off

Annual Plan

  • All the features of the Professional Plan, but for 39% off!
  • Billed annually
  • No expiration
  • For the normal price of 10 articles elsewhere, you get one full year of unlimited access to articles.

$588

$360/year

billed annually
Start Free Trial

14-day Free Trial