Contamination control requirements implementation for the James Webb Space Telescope (JWST), part 1: optics, instruments and thermal vacuum testing

Contamination control requirements implementation for the James Webb Space Telescope (JWST), part... The derivation of contamination control (CC) requirements for the JWST Optical Telescope Element (OTE) was presented at the SPIE conference in 20081. Since then, much work has been done to allocate contamination at each phase of Integration and Test (IandT) and to plan for achieving the allocations. Because JWST is such a large and complicated observatory, plans for meeting the requirements are many and varied. There are primary mirror segments that must be cleaned early and maintained clean; there are four science instruments that each have tight contamination requirements but cannot be cleaned after they are integrated onto the Integrated Science Instrument Module (ISIM) structure; there is the composite ISIM structure that is fragile and must be minimally handled; there are numerous cryo-vacuum tests that must be controlled and monitored in order to minimize molecular contamination during return to ambient; … and more. An overview of plans developed to implement contamination control for JWST optics, instruments, and thermal vacuum testing for JWST will be presented. http://www.deepdyve.com/assets/images/DeepDyve-Logo-lg.png Proceedings of SPIE SPIE

Contamination control requirements implementation for the James Webb Space Telescope (JWST), part 1: optics, instruments and thermal vacuum testing

Loading next page...
 
/lp/spie/contamination-control-requirements-implementation-for-the-james-webb-jUTtlq4zzT

References (4)

Publisher
SPIE
Copyright
COPYRIGHT SPIE. Downloading of the abstract is permitted for personal use only.
ISSN
0277-786X
eISSN
1996-756X
DOI
10.1117/12.2066500
Publisher site
See Article on Publisher Site

Abstract

The derivation of contamination control (CC) requirements for the JWST Optical Telescope Element (OTE) was presented at the SPIE conference in 20081. Since then, much work has been done to allocate contamination at each phase of Integration and Test (IandT) and to plan for achieving the allocations. Because JWST is such a large and complicated observatory, plans for meeting the requirements are many and varied. There are primary mirror segments that must be cleaned early and maintained clean; there are four science instruments that each have tight contamination requirements but cannot be cleaned after they are integrated onto the Integrated Science Instrument Module (ISIM) structure; there is the composite ISIM structure that is fragile and must be minimally handled; there are numerous cryo-vacuum tests that must be controlled and monitored in order to minimize molecular contamination during return to ambient; … and more. An overview of plans developed to implement contamination control for JWST optics, instruments, and thermal vacuum testing for JWST will be presented.

Journal

Proceedings of SPIESPIE

Published: Sep 9, 2014

There are no references for this article.