Get 20M+ Full-Text Papers For Less Than $1.50/day. Start a 14-Day Trial for You or Your Team.

Learn More →

Keyword Index Volume 10 (2014)

Keyword Index Volume 10 (2014) Bridge Structures 10 (2014) 163 IOS Press AASHTO HL93 live load Al-Zn alloy galvanized wire anticorrosion arch bridge bridge cables bridge fire bridge cable spacing cable-stayed arch bridge cable-stayed bridge cable-stayed collapse process corrosion critical flaw size curved bridge deck stiffness ERB fatigue finite element analysis finite element foundation design FPS high strength concrete integral abutment bridges integral abutment load test LRB 77 3 55 63 3 43 11, 129 129 63 63 129 63 3 87 145 129 145 11 105 11 11 145 77 117 11 105 145 magnetic particle inspection metallurgical evaluation MR multi-column foundation optimization parametric study pile postbuckling radiographic testing redundancy seismic analysis seismic behavior seismic design seismic isolation seismic verification standard AASHTO girders steel piles suspension bridge transverse stiffener truss bridge ultimate strength vertical deformation visual inspection web shear buckling 87 87 145 55 129 77 11 43 87 105 145 117 117 145 55 77 117 55 43 105 63 129 87 43 1573-2487/14/$27.50 © 2014 ­ IOS Press and the authors. All rights reserved http://www.deepdyve.com/assets/images/DeepDyve-Logo-lg.png Bridge Structures IOS Press

Keyword Index Volume 10 (2014)

Bridge Structures , Volume 10 (4) – Jan 1, 2014

Loading next page...
 
/lp/ios-press/keyword-index-volume-10-2014-ffDXqLWDFF

References

References for this paper are not available at this time. We will be adding them shortly, thank you for your patience.

Publisher
IOS Press
Copyright
Copyright © 2014 by IOS Press, Inc
ISSN
1573-2487
eISSN
1744-8999
Publisher site
See Article on Publisher Site

Abstract

Bridge Structures 10 (2014) 163 IOS Press AASHTO HL93 live load Al-Zn alloy galvanized wire anticorrosion arch bridge bridge cables bridge fire bridge cable spacing cable-stayed arch bridge cable-stayed bridge cable-stayed collapse process corrosion critical flaw size curved bridge deck stiffness ERB fatigue finite element analysis finite element foundation design FPS high strength concrete integral abutment bridges integral abutment load test LRB 77 3 55 63 3 43 11, 129 129 63 63 129 63 3 87 145 129 145 11 105 11 11 145 77 117 11 105 145 magnetic particle inspection metallurgical evaluation MR multi-column foundation optimization parametric study pile postbuckling radiographic testing redundancy seismic analysis seismic behavior seismic design seismic isolation seismic verification standard AASHTO girders steel piles suspension bridge transverse stiffener truss bridge ultimate strength vertical deformation visual inspection web shear buckling 87 87 145 55 129 77 11 43 87 105 145 117 117 145 55 77 117 55 43 105 63 129 87 43 1573-2487/14/$27.50 © 2014 ­ IOS Press and the authors. All rights reserved

Journal

Bridge StructuresIOS Press

Published: Jan 1, 2014

There are no references for this article.