Access the full text.
Sign up today, get DeepDyve free for 14 days.
R. Troutbeck (1984)
Capacity and delays at roundabouts - a literature reviewAustralian road research, 14
G. Louah (1988)
Recent French Studies on Capacity and Waiting Times at Rural Unsignalized Intersections
A. Plank, E. Catchpole (1984)
A GENERAL CAPACITY FORMULA FOR AN UNCONTROLLED INTERSECTIONTraffic engineering and control, 25
M. McDonald, D. Armitage (1978)
THE CAPACITY OF ROUNDABOUTSTraffic engineering and control, 19
R. Ashworth, J. Tanner, C. Laurence, J. Wardrop (1978)
A NEW PROCEDURE FOR CAPACITY CALCULATIONS AT CONVENTIONAL ROUNDABOUTS., 65
D. Gerlough, M. Huber (1975)
Traffic flow theory : a monograph
J. Tanner (1967)
The capacity of uncontrolled intersection.Biometrika, 54 3
J. Tanner (1962)
A theoretical analysis of delays at an uncontrolled intersectionBiometrika, 49
D. Owens (1960)
FLOW MEASUREMENTS AT A NUMBER OF UNCONTROLLED T-JUNCTIONS
R. Troutbeck (1986)
Average Delay at an Unsignalized Intersection with Two Major Streams Each Having a Dichotomized Headway DistributionTransp. Sci., 20
R. Troutbeck (1988)
Current and Future Australian Practices for the Design of Unsignalized Intersections
R. Kimber, M. McDonald, N. Hounsell (1986)
THE PREDICTION OF SATURATION FLOWS FOR ROAD JUNCTIONS CONTROLLED BY TRAFFIC SIGNALSTRRL RESEARCH REPORT
R. Ashworth, J. Field (1973)
THE CAPACITY OF ROTARY INTERSECTIONS, 20
C. Daganzo (1977)
Traffic Delay at Unsignalized Intersections: Clarification of Some IssuesTransportation Science, 11
R. Troutbeck (1988)
Intersections, roundabouts and minis
R. Troutbeck (1984)
DOES GAP ACCEPTANCE THEORY ADEQUATELY PREDICT THE CAPACITY OF A ROUNDABOUTAustralian road research, 12
I. Burrow (1986)
THE EFFECT OF DARKNESS ON THE CAPACITY OF ROAD JUNCTIONSTraffic engineering and control, 27
R. Kimber, R. Coombe (1980)
THE TRAFFIC CAPACITY OF MAJOR/MINOR PRIORITY JUNCTIONS
The paper compares the results of extensive measurements of the capacity of nonpriority traffic streams at major/minor junctions and roundabouts with the predictions of models based on gap-acceptance theory. There are significant differences in the form of the relation between the capacity and the traffic flows in the priority streams. The simple gap-acceptance models are poor predictors of the capacity in the United Kingdom, for they seriously overpredict at low values of priority flow and underpredict at high values. At the lower values the gap-acceptance predictions can only be made to agree with the results of the empirical measurements by introducing a dependence of the move-up times on the value of the flows in the priority streams. The discrepancies at the higher values of priority flow are probably due to gap-forcing and priority reversal, both of which are commonly observed in the United Kingdom, but whose occurrence may vary from one country to another as a result of differences in driver behavior, legal sanctions, and enforcement policies. Several gap-acceptance models of roundabout capacities are compared and are found to be mutually inconsistent.
Transportation Science – INFORMS
Published: May 1, 1989
Read and print from thousands of top scholarly journals.
Already have an account? Log in
Bookmark this article. You can see your Bookmarks on your DeepDyve Library.
To save an article, log in first, or sign up for a DeepDyve account if you don’t already have one.
Copy and paste the desired citation format or use the link below to download a file formatted for EndNote
Access the full text.
Sign up today, get DeepDyve free for 14 days.
All DeepDyve websites use cookies to improve your online experience. They were placed on your computer when you launched this website. You can change your cookie settings through your browser.