Training gaps in the adoption of building information modelling by Nigerian construction professionals

Training gaps in the adoption of building information modelling by Nigerian construction... The opportunities that the building information modeling (BIM) mode of project delivery presents warrant the need for the construction professionals to be adequately trained on BIM technology and processes. The purpose of this paper is to assess the training gaps that exist between the perceived and expected knowledge of BIM practice among construction professionals in Nigeria.Design/methodology/approachThe study was carried out through a structured questionnaire survey administered on identifying training gaps among registered Nigerian construction professionals toward BIM adoption. Relevant information on the perceived and expected BIM mode of practices was systematically collected from 212 participants who are familiar with BIM concepts. The data generated were analyzed using descriptive statistics and gap analysis.FindingsGap analysis was employed in determining the significance of BIM training gap for various practices among the construction professionals. The most significant gaps in BIM practice with gap analysis value>1 are the project review technique and clash detection for architectural practice. Among quantity surveyors, cost estimating, preparation of bills of quantities and project budgeting are the practice areas where there are significant training gaps in adopting BIM. For engineering practices, the gap analysis reveals a significant training gap in design creation and coordination, as-built-modeling, clash detection and space management.Research limitations/implicationsThe research is limited to the perception of the respondents on actual and ideal BIM practices, not considering the process workflow, facility requirements and other issues that revolve round BIM adoption and implementation. It is also limited to professionals in the industry, and further studies will be appropriate to address these limitations.Practical implicationsThe study reveals that there is a great need to meet the training gaps for BIM adoption in ensuring efficiency of construction project delivery.Originality/valueThe gaps that exist between the actual and expected BIM training were statistically established. http://www.deepdyve.com/assets/images/DeepDyve-Logo-lg.png Built Environment Project and Asset Management Emerald Publishing

Training gaps in the adoption of building information modelling by Nigerian construction professionals

Loading next page...
 
/lp/emerald-publishing/training-gaps-in-the-adoption-of-building-information-modelling-by-rG1MudX8Q9
Publisher
Emerald Publishing
Copyright
© Emerald Publishing Limited
ISSN
2044-124X
DOI
10.1108/bepam-10-2017-0090
Publisher site
See Article on Publisher Site

Abstract

The opportunities that the building information modeling (BIM) mode of project delivery presents warrant the need for the construction professionals to be adequately trained on BIM technology and processes. The purpose of this paper is to assess the training gaps that exist between the perceived and expected knowledge of BIM practice among construction professionals in Nigeria.Design/methodology/approachThe study was carried out through a structured questionnaire survey administered on identifying training gaps among registered Nigerian construction professionals toward BIM adoption. Relevant information on the perceived and expected BIM mode of practices was systematically collected from 212 participants who are familiar with BIM concepts. The data generated were analyzed using descriptive statistics and gap analysis.FindingsGap analysis was employed in determining the significance of BIM training gap for various practices among the construction professionals. The most significant gaps in BIM practice with gap analysis value>1 are the project review technique and clash detection for architectural practice. Among quantity surveyors, cost estimating, preparation of bills of quantities and project budgeting are the practice areas where there are significant training gaps in adopting BIM. For engineering practices, the gap analysis reveals a significant training gap in design creation and coordination, as-built-modeling, clash detection and space management.Research limitations/implicationsThe research is limited to the perception of the respondents on actual and ideal BIM practices, not considering the process workflow, facility requirements and other issues that revolve round BIM adoption and implementation. It is also limited to professionals in the industry, and further studies will be appropriate to address these limitations.Practical implicationsThe study reveals that there is a great need to meet the training gaps for BIM adoption in ensuring efficiency of construction project delivery.Originality/valueThe gaps that exist between the actual and expected BIM training were statistically established.

Journal

Built Environment Project and Asset ManagementEmerald Publishing

Published: Jul 5, 2019

Keywords: Nigeria; Construction professionals; Construction projects; Gap analysis; Building information modelling; Training gap