Access the full text.
Sign up today, get DeepDyve free for 14 days.
The opportunities that the building information modeling (BIM) mode of project delivery presents warrant the need for the construction professionals to be adequately trained on BIM technology and processes. The purpose of this paper is to assess the training gaps that exist between the perceived and expected knowledge of BIM practice among construction professionals in Nigeria.Design/methodology/approachThe study was carried out through a structured questionnaire survey administered on identifying training gaps among registered Nigerian construction professionals toward BIM adoption. Relevant information on the perceived and expected BIM mode of practices was systematically collected from 212 participants who are familiar with BIM concepts. The data generated were analyzed using descriptive statistics and gap analysis.FindingsGap analysis was employed in determining the significance of BIM training gap for various practices among the construction professionals. The most significant gaps in BIM practice with gap analysis value>1 are the project review technique and clash detection for architectural practice. Among quantity surveyors, cost estimating, preparation of bills of quantities and project budgeting are the practice areas where there are significant training gaps in adopting BIM. For engineering practices, the gap analysis reveals a significant training gap in design creation and coordination, as-built-modeling, clash detection and space management.Research limitations/implicationsThe research is limited to the perception of the respondents on actual and ideal BIM practices, not considering the process workflow, facility requirements and other issues that revolve round BIM adoption and implementation. It is also limited to professionals in the industry, and further studies will be appropriate to address these limitations.Practical implicationsThe study reveals that there is a great need to meet the training gaps for BIM adoption in ensuring efficiency of construction project delivery.Originality/valueThe gaps that exist between the actual and expected BIM training were statistically established.
Built Environment Project and Asset Management – Emerald Publishing
Published: Jul 5, 2019
Keywords: Nigeria; Construction professionals; Construction projects; Gap analysis; Building information modelling; Training gap
Read and print from thousands of top scholarly journals.
Already have an account? Log in
Bookmark this article. You can see your Bookmarks on your DeepDyve Library.
To save an article, log in first, or sign up for a DeepDyve account if you don’t already have one.
Copy and paste the desired citation format or use the link below to download a file formatted for EndNote
Access the full text.
Sign up today, get DeepDyve free for 14 days.
All DeepDyve websites use cookies to improve your online experience. They were placed on your computer when you launched this website. You can change your cookie settings through your browser.