Get 20M+ Full-Text Papers For Less Than $1.50/day. Start a 14-Day Trial for You or Your Team.

Learn More →

Third Aircraft Production Conference at Southampton

Third Aircraft Production Conference at Southampton THE conference opened with the paper by Mr WoodwardNutt, which, together with the other papers, is summarized below. After the first session the conference luncheon was held, and the principal speakers were the Mayor of Southampton, Alderman R. E. Edmunds, who welcomed the conference to Southampton, and Sir Edward Boyle, Parliamentary Secretary to the Ministry of Supply, who referred to current concern about delays in fighter deliveries. He said that there had in the last year been setbacks, but the delays were due to difficulties of development rather than of production. The comparison which was often made of deliveries during the last war was not fair, because the aircraft in question had then been developed. The Spitfire took five years to develop, and this did not compare so unfavourably with the development of the Hunter, when the increase in complexity and the aerodynamic difficulties of the transonic region were considered. Flight trials were the only indication of many of these troubles, and modifications were necessary after the tests. It was for this reason that the Ministry had adopted the policy of ordering up to twenty development aircraft, with the intention that by the time the last one had been built it would be in a form suitable for the production version. http://www.deepdyve.com/assets/images/DeepDyve-Logo-lg.png Aircraft Engineering and Aerospace Technology Emerald Publishing

Third Aircraft Production Conference at Southampton

Aircraft Engineering and Aerospace Technology , Volume 27 (3): 5 – Mar 1, 1955

Loading next page...
 
/lp/emerald-publishing/third-aircraft-production-conference-at-southampton-jZ7R4lSFtY
Publisher
Emerald Publishing
Copyright
Copyright © Emerald Group Publishing Limited
ISSN
0002-2667
DOI
10.1108/eb032533
Publisher site
See Article on Publisher Site

Abstract

THE conference opened with the paper by Mr WoodwardNutt, which, together with the other papers, is summarized below. After the first session the conference luncheon was held, and the principal speakers were the Mayor of Southampton, Alderman R. E. Edmunds, who welcomed the conference to Southampton, and Sir Edward Boyle, Parliamentary Secretary to the Ministry of Supply, who referred to current concern about delays in fighter deliveries. He said that there had in the last year been setbacks, but the delays were due to difficulties of development rather than of production. The comparison which was often made of deliveries during the last war was not fair, because the aircraft in question had then been developed. The Spitfire took five years to develop, and this did not compare so unfavourably with the development of the Hunter, when the increase in complexity and the aerodynamic difficulties of the transonic region were considered. Flight trials were the only indication of many of these troubles, and modifications were necessary after the tests. It was for this reason that the Ministry had adopted the policy of ordering up to twenty development aircraft, with the intention that by the time the last one had been built it would be in a form suitable for the production version.

Journal

Aircraft Engineering and Aerospace TechnologyEmerald Publishing

Published: Mar 1, 1955

There are no references for this article.