Get 20M+ Full-Text Papers For Less Than $1.50/day. Start a 14-Day Trial for You or Your Team.

Learn More →

The new lubricants plant at BARTON

The new lubricants plant at BARTON The opening ceremony for the new Shell Lubricants Plant at Barton was performed on September 25th, by Sir Frederick West, G.B.E., who was introduced by Mr. C. M. Vignoles, O.B.E., Managing Director of ShellMex and B.P. Ltd. The large gathering of guests included the executive of the contracting companies whose designs and products had been incorporated in this very modern plant which has been completed at a cost of about 500,000. http://www.deepdyve.com/assets/images/DeepDyve-Logo-lg.png Industrial Lubrication and Tribology Emerald Publishing

The new lubricants plant at BARTON

Industrial Lubrication and Tribology , Volume 3 (11): 6 – Nov 1, 1951

Loading next page...
 
/lp/emerald-publishing/the-new-lubricants-plant-at-barton-LxchUTZwSJ

References

References for this paper are not available at this time. We will be adding them shortly, thank you for your patience.

Publisher
Emerald Publishing
Copyright
Copyright © Emerald Group Publishing Limited
ISSN
0036-8792
DOI
10.1108/eb052137
Publisher site
See Article on Publisher Site

Abstract

The opening ceremony for the new Shell Lubricants Plant at Barton was performed on September 25th, by Sir Frederick West, G.B.E., who was introduced by Mr. C. M. Vignoles, O.B.E., Managing Director of ShellMex and B.P. Ltd. The large gathering of guests included the executive of the contracting companies whose designs and products had been incorporated in this very modern plant which has been completed at a cost of about 500,000.

Journal

Industrial Lubrication and TribologyEmerald Publishing

Published: Nov 1, 1951

There are no references for this article.