Simultaneous determination of production lot size and preventive maintenance schedule for unreliable production system

Simultaneous determination of production lot size and preventive maintenance schedule for... Purpose – The purpose of this study is to propose and model an integrated production‐maintenance strategy for unreliable production systems producing conforming and non‐conforming items. Design/methodology/approach – The proposed integrated policy is defined and modeled mathematically. Findings – The paper focuses on finding simultaneously the optimal values of the lot size Q and the age T at which preventive maintenance must be performed. These values minimize the total average cost per time unit over an infinite horizon. Practical implications – The paper attempts to integrate in a single model the three main aspects of any manufacturing system: production, maintenance, and quality. It deals with the lot‐sizing problem for a production system which may randomly shift to an out‐of‐control state and produce non‐conforming units. The system is submitted to an age‐based preventive maintenance policy. The effect of performing preventive maintenance on quality‐ and inventory‐related costs is shown through a numerical example. Originality/value – The paper proposes an integrated model that links EMQ, quality and an age‐based preventive maintenance policy. It is shown that performing preventive maintenance yields reduction in inventory‐ and quality‐related costs. http://www.deepdyve.com/assets/images/DeepDyve-Logo-lg.png Journal of Quality in Maintenance Engineering Emerald Publishing

Simultaneous determination of production lot size and preventive maintenance schedule for unreliable production system

Loading next page...
 
/lp/emerald-publishing/simultaneous-determination-of-production-lot-size-and-preventive-F6UVk4PHnG
Publisher
Emerald Publishing
Copyright
Copyright © 2008 Emerald Group Publishing Limited. All rights reserved.
ISSN
1355-2511
DOI
10.1108/13552510810877665
Publisher site
See Article on Publisher Site

Abstract

Purpose – The purpose of this study is to propose and model an integrated production‐maintenance strategy for unreliable production systems producing conforming and non‐conforming items. Design/methodology/approach – The proposed integrated policy is defined and modeled mathematically. Findings – The paper focuses on finding simultaneously the optimal values of the lot size Q and the age T at which preventive maintenance must be performed. These values minimize the total average cost per time unit over an infinite horizon. Practical implications – The paper attempts to integrate in a single model the three main aspects of any manufacturing system: production, maintenance, and quality. It deals with the lot‐sizing problem for a production system which may randomly shift to an out‐of‐control state and produce non‐conforming units. The system is submitted to an age‐based preventive maintenance policy. The effect of performing preventive maintenance on quality‐ and inventory‐related costs is shown through a numerical example. Originality/value – The paper proposes an integrated model that links EMQ, quality and an age‐based preventive maintenance policy. It is shown that performing preventive maintenance yields reduction in inventory‐ and quality‐related costs.

Journal

Journal of Quality in Maintenance EngineeringEmerald Publishing

Published: May 30, 2008

Keywords: Lot size; Preventive maintenance; Quality; Inventory