Simulation modeling and sensitivity analysis of a tunneling construction project's supply chain

Simulation modeling and sensitivity analysis of a tunneling construction project's supply chain Purpose – The purpose of this paper is to develop a simulation model capable of capturing the complex variables impacting the productivity of tunneling construction projects. Design/methodology/approach – Simulation modeling is used to construct high‐level models of construction supply networks in order to perform quantitative analysis, enabling planners to work out the embedded complexities of the system. Findings – This study presents a detailed simulation model of a real life tunnel construction project along with its supply chain of liner segments. Using this detailed model, a sensitivity analysis for the tunneling project shows the impact of chosen variables on the duration of a tunneling project; these results are used to verify the importance of considering the whole supply chain of a construction project in the planning stage. Practical implications – Effective quality control, consideration of the shortage of storage space, and anticipation of required lead time when placing the first order to achieve the full storage capacity of liners before the start of a project are some practices that can be employed by construction organizations to address supply chain issues for tunneling projects. Originality/value – Research into quantifying the benefits of implementing supply chain management (SCM) is very limited: the literature for the construction industry generally discusses how SCM concepts can be adopted, or what problems and challenges inhibit such adoption without analyzing and quantifying the effects of these techniques on an actual construction project. http://www.deepdyve.com/assets/images/DeepDyve-Logo-lg.png Engineering, Construction and Architectural Management Emerald Publishing

Simulation modeling and sensitivity analysis of a tunneling construction project's supply chain

Loading next page...
 
/lp/emerald-publishing/simulation-modeling-and-sensitivity-analysis-of-a-tunneling-2t3su6uOnA
Publisher
Emerald Publishing
Copyright
Copyright © 2011 Emerald Group Publishing Limited. All rights reserved.
ISSN
0969-9988
DOI
10.1108/09699981011074600
Publisher site
See Article on Publisher Site

Abstract

Purpose – The purpose of this paper is to develop a simulation model capable of capturing the complex variables impacting the productivity of tunneling construction projects. Design/methodology/approach – Simulation modeling is used to construct high‐level models of construction supply networks in order to perform quantitative analysis, enabling planners to work out the embedded complexities of the system. Findings – This study presents a detailed simulation model of a real life tunnel construction project along with its supply chain of liner segments. Using this detailed model, a sensitivity analysis for the tunneling project shows the impact of chosen variables on the duration of a tunneling project; these results are used to verify the importance of considering the whole supply chain of a construction project in the planning stage. Practical implications – Effective quality control, consideration of the shortage of storage space, and anticipation of required lead time when placing the first order to achieve the full storage capacity of liners before the start of a project are some practices that can be employed by construction organizations to address supply chain issues for tunneling projects. Originality/value – Research into quantifying the benefits of implementing supply chain management (SCM) is very limited: the literature for the construction industry generally discusses how SCM concepts can be adopted, or what problems and challenges inhibit such adoption without analyzing and quantifying the effects of these techniques on an actual construction project.

Journal

Engineering, Construction and Architectural ManagementEmerald Publishing

Published: Sep 6, 2011

Keywords: Supply chain management; Project management; Systems management; Simulation; Modelling; Tunnel construction; Productivity analysis

References

You’re reading a free preview. Subscribe to read the entire article.


DeepDyve is your
personal research library

It’s your single place to instantly
discover and read the research
that matters to you.

Enjoy affordable access to
over 18 million articles from more than
15,000 peer-reviewed journals.

All for just $49/month

Explore the DeepDyve Library

Search

Query the DeepDyve database, plus search all of PubMed and Google Scholar seamlessly

Organize

Save any article or search result from DeepDyve, PubMed, and Google Scholar... all in one place.

Access

Get unlimited, online access to over 18 million full-text articles from more than 15,000 scientific journals.

Your journals are on DeepDyve

Read from thousands of the leading scholarly journals from SpringerNature, Wiley-Blackwell, Oxford University Press and more.

All the latest content is available, no embargo periods.

See the journals in your area

DeepDyve

Freelancer

DeepDyve

Pro

Price

FREE

$49/month
$360/year

Save searches from
Google Scholar,
PubMed

Create folders to
organize your research

Export folders, citations

Read DeepDyve articles

Abstract access only

Unlimited access to over
18 million full-text articles

Print

20 pages / month

PDF Discount

20% off