Access the full text.
Sign up today, get DeepDyve free for 14 days.
B. Foote, A. Ravindran, S. Lashine (1988)
Computational feasibility of multi-criteria models of production, planning and schedulingComputers & Industrial Engineering, 15
K. Høyland, S. Wallace (2001)
Generating Scenario Trees for Multistage Decision ProblemsManag. Sci., 47
Harry Groenvelt, L. Pintelon, A. Seidmann (1992)
Production lot sizing with machine breakdownsManagement Science, 38
Feng Luan, Jong-Ho Choi, Hyun-Kyo Jung (2012)
A Particle Swarm Optimization Algorithm With Novel Expected Fitness Evaluation for Robust Optimization ProblemsIEEE Transactions on Magnetics, 48
J. Mazzola, A. Neebe, Christopher Rump (1998)
Multiproduct production planning in the presence of work-force learningEur. J. Oper. Res., 106
A. Soyster (1973)
Technical Note - Convex Programming with Set-Inclusive Constraints and Applications to Inexact Linear ProgrammingOper. Res., 21
Sang-jin Nam, R. Logendran (1992)
Aggregate production planning — A survey of models and methodologiesEuropean Journal of Operational Research, 61
G. Suresh, S. Sahu (1994)
Stochastic assembly line balancing using simulated annealingInternational Journal of Production Research, 32
P. Vilarinho, A. Simaria (2002)
A two-stage heuristic method for balancing mixed-model assembly lines with parallel workstationsInternational Journal of Production Research, 40
Dawei Bai, Tamra Carpenter, J. Mulvey (1997)
Making a case for robust optimization modelsManagement Science, 43
S. Lapierre, Angel Ruiz, P. Soriano (2006)
Balancing assembly lines with tabu searchEur. J. Oper. Res., 168
Jangho Seo, C. Im, Sangyeop Kwak, Cheol-Gyun Lee, Hyun-Kyo Jung (2008)
An Improved Particle Swarm Optimization Algorithm Mimicking Territorial Dispute Between Groups for Multimodal Function Optimization ProblemsIEEE Transactions on Magnetics, 44
(2003)
Digital Object Identifier (DOI) 10.1007/s10107-003-0396-4
Y. Chiu, Kuang-Ku Chen, F. Cheng, Mei-Fang Wu (2010)
Optimization of the finite production rate model with scrap, rework and stochastic machine breakdownComput. Math. Appl., 59
L. Whitley (1994)
A genetic algorithm tutorialStatistics and Computing, 4
A. Gutjahr, G. Nemhauser (1964)
An Algorithm for the Line Balancing ProblemManagement Science, 11
A. Baykasoğlu (2001)
MOAPPS 1.0: Aggregate production planning using the multiple-objective tabu searchInternational Journal of Production Research, 39
R. Poli, J. Kennedy, T. Blackwell (1995)
Particle swarm optimizationSwarm Intelligence, 1
D. Alem, R. Morabito (2012)
Production planning in furniture settings via robust optimizationComput. Oper. Res., 39
D. Bertsimas, Melvyn Sim (2004)
The Price of RobustnessOper. Res., 52
C. Kim, Yushin Hong, Sooyoung Kim (1997)
An extended optimal lot sizing model with an unreliable machineProduction Planning & Control, 8
Jangho Seo, C. Im, C. Heo, Jae-Kwang Kim, Hyun-Kyo Jung, Cheol-Gyun Lee (2006)
Multimodal function optimization based on particle swarm optimizationIEEE Transactions on Magnetics, 42
S. Chiu, Y. Chiu (2006)
Mathematical modeling for production system with backlogging and failure in repairJournal of Scientific & Industrial Research, 65
J. Mulvey, R. Vanderbei, S. Zenios (1995)
Robust Optimization of Large-Scale SystemsOper. Res., 43
S. Seyed-Alagheband, S. Ghomi, M. Zandieh (2011)
A simulated annealing algorithm for balancing the assembly line type II problem with sequence-dependent setup times between tasksInternational Journal of Production Research, 49
V. Makis, James Fung (1998)
An EMQ model with inspections and random machine failuresJournal of the Operational Research Society, 49
K. DeJong (1975)
An analysis of the behavior of a class of genetic adaptive systems
P. Porkka, A. Vepsäläinen, Markku Kuula (2003)
Multiperiod production planning carrying over set-up timeInternational Journal of Production Research, 41
Reay-Chen Wang, H. Fang (2001)
Aggregate production planning with multiple objectives in a fuzzy environmentEur. J. Oper. Res., 133
G. Buxey (1993)
Production Planning and Scheduling for Seasonal DemandInternational Journal of Operations & Production Management, 13
J. Holland (1975)
Adaptation in natural and artificial systems
A. Masud, C. Hwang (1980)
An aggregate production planning model and application of three multiple objective decision methodsInternational Journal of Production Research, 18
A. Ben-Tal, A. Nemirovski (1998)
Robust Convex OptimizationMath. Oper. Res., 23
M. Azab (2011)
Harmonic Elimination in Three-Phase Voltage Source Inverters by Particle Swarm OptimizationJournal of Electrical Engineering & Technology, 6
A. Ajami, G. Aghajani, M. Pourmahmood (2010)
Optimal Location of FACTS Devices Using Adaptive Particle Swarm Optimization Hybrid with Simulated AnnealingJournal of Electrical Engineering & Technology, 5
S. Sumathi, Surekha Paneerselvam (2010)
Computational Intelligence Paradigms: Theory & Applications using MATLAB
S. Chiu, D. Gong, H. Wee (2004)
Effects of random defective rate and imperfect rework process on economic production quantity modelJapan Journal of Industrial and Applied Mathematics, 21
L. Schmidt, J. Jackman (1995)
Evaluating assembly sequences for automatic assembly systemsIie Transactions, 27
Kun-Jen Chung (1997)
Bounds for production lot sizing with machine breakdownsComputers & Industrial Engineering, 32
Purpose – This paper aims to consider a multi-site production planning problem with failure in rework and breakdown subject to demand uncertainty. Design/methodology/approach – In this new mathematical model, at first, a feasible range for production time is found, and then the model is rewritten considering the demand uncertainty and robust optimization techniques. Here, three evolutionary methods are presented: robust particle swarm optimization, robust genetic algorithm (RGA) and robust simulated annealing with the ability of handling uncertainties. Firstly, the proposed mathematical model is validated by solving a problem in the LINGO environment. Afterwards, to compare and find the efficiency of the proposed evolutionary methods, some large-size test problems are solved. Findings – The results show that the proposed models can prepare a promising approach to fulfill an efficient production planning in multi-site production planning. Results obtained by comparing the three proposed algorithms demonstrate that the presented RGA has better and more efficient solutions. Originality/value – Considering the robust optimization approach to production system with failure in rework and breakdown under uncertainty.
Assembly Automation – Emerald Publishing
Published: Feb 2, 2015
Read and print from thousands of top scholarly journals.
Already have an account? Log in
Bookmark this article. You can see your Bookmarks on your DeepDyve Library.
To save an article, log in first, or sign up for a DeepDyve account if you don’t already have one.
Copy and paste the desired citation format or use the link below to download a file formatted for EndNote
Access the full text.
Sign up today, get DeepDyve free for 14 days.
All DeepDyve websites use cookies to improve your online experience. They were placed on your computer when you launched this website. You can change your cookie settings through your browser.