Risk matrix for factors affecting time delay in road construction projects: owners' perspective

Risk matrix for factors affecting time delay in road construction projects: owners' perspective Purpose – The aim of this study is to identify the risk matrix for factors causing time delay in road construction projects in the West Bank in Palestine from owners' viewpoint. Design/methodology/approach – In total, 43 factors that might cause delays of road construction projects were defined through a detailed literature review. The factors were tabulated in a questionnaire form, which was sent out to a total of 25 public owners asking their contribution in identifying the risk matrix for the 43 factors in terms of impact and probability of occurrence. Three zones were used in the matrix according to the degree of factors' severity on the projects' time delay; they are: green, yellow, and red. Findings – The analysis of 43 factors considered indicates that six factors are located in the green zone, 29 factors are located in the yellow zone, and eight factors are located in the red zone. Originality/value – The paper identifies the risk matrix for factors affecting time delay in road construction projects in the West Bank in Palestine from the owners' perspective. http://www.deepdyve.com/assets/images/DeepDyve-Logo-lg.png Engineering, Construction and Architectural Management Emerald Publishing

Risk matrix for factors affecting time delay in road construction projects: owners' perspective

Loading next page...
 
/lp/emerald-publishing/risk-matrix-for-factors-affecting-time-delay-in-road-construction-KqYtOAG7HM
Publisher
Emerald Publishing
Copyright
Copyright © 2011 Emerald Group Publishing Limited. All rights reserved.
ISSN
0969-9988
DOI
10.1108/09699981111180917
Publisher site
See Article on Publisher Site

Abstract

Purpose – The aim of this study is to identify the risk matrix for factors causing time delay in road construction projects in the West Bank in Palestine from owners' viewpoint. Design/methodology/approach – In total, 43 factors that might cause delays of road construction projects were defined through a detailed literature review. The factors were tabulated in a questionnaire form, which was sent out to a total of 25 public owners asking their contribution in identifying the risk matrix for the 43 factors in terms of impact and probability of occurrence. Three zones were used in the matrix according to the degree of factors' severity on the projects' time delay; they are: green, yellow, and red. Findings – The analysis of 43 factors considered indicates that six factors are located in the green zone, 29 factors are located in the yellow zone, and eight factors are located in the red zone. Originality/value – The paper identifies the risk matrix for factors affecting time delay in road construction projects in the West Bank in Palestine from the owners' perspective.

Journal

Engineering, Construction and Architectural ManagementEmerald Publishing

Published: Nov 8, 2011

Keywords: Risk management; Road construction; Time delay; Risk matrix; Construction management; Construction operations; Risk analysis; Palestine