Access the full text.
Sign up today, get DeepDyve free for 14 days.
M. Dorval, M.-H. Jobin, Nadia Benomar (2019)
Lean culture: a comprehensive systematic literature reviewInternational Journal of Productivity and Performance Management
A. Sánchez, M. Pérez (2001)
Lean indicators and manufacturing strategiesInternational Journal of Operations & Production Management, 21
Chen-Fu Chien, A. Diaz, Yu-Bin Lan (2014)
A data mining approach for analyzing semiconductor MES and FDC data to enhance overall usage effectiveness (OUE)Int. J. Comput. Intell. Syst., 7
R. Sharma, Dinesh Kumar, Pradeep Kumar (2006)
Manufacturing excellence through TPM implementation: a practical analysisInd. Manag. Data Syst., 106
(2008)
Measuring and improving the productivity of the U.S. construction industry: issues, challenges, and opportunities
H. Yamashina, T. Kubo (2002)
Manufacturing cost deploymentInternational Journal of Production Research, 40
Nur Aminuddin, J. Garza‐Reyes, Prof Kumar, J. Antony, Luis Rocha-Lona (2016)
An analysis of managerial factors affecting the implementation and use of overall equipment effectivenessInternational Journal of Production Research, 54
A. Ron, J. Rooda (2005)
Equipment effectiveness: OEE revisitedIEEE Transactions on Semiconductor Manufacturing, 18
(2011)
Can workforce management help?
Sara Langlo (2017)
International Journal of Productivity and Performance Management Analyzing electrical installation labor productivity through work sampling
E. Lou, M. Alshawi (2009)
Critical success factors for e-tendering implementation in construction collaborative environments: people and process issuesJ. Inf. Technol. Constr., 14
Hee-Sung Park, S. Thomas, R. Tucker (2005)
Benchmarking of Construction ProductivityJournal of Construction Engineering and Management-asce, 131
L. Negrão, Moacir Filho, G. Marodin (2016)
Lean practices and their effect on performance: a literature reviewProduction Planning & Control, 28
(2011)
Identification of factors affecting production-worker-effectiveness for six sigma
Gökan May, Ilaria Barletta, Bojan Stahl, M. Taisch (2015)
Energy management in production: A novel method to develop key performance indicators for improving energy efficiencyApplied Energy, 149
S. Naoum (2016)
Factors influencing labor productivity on construction sitesInternational Journal of Productivity and Performance Management, 65
F. Zammori, M. Braglia, M. Frosolini (2011)
Stochastic overall equipment effectivenessInternational Journal of Production Research, 49
Pius Achanga, E. Shehab, R. Roy, G. Nelder (2006)
Critical success factors for lean implementation within SMEsJournal of Manufacturing Technology Management, 17
P. Tsarouhas (2019)
Improving operation of the croissant production line through overall equipment effectiveness (OEE)International Journal of Productivity and Performance Management
C. Ajila, Awonusi Abiola (2004)
Influence of Rewards on Workers Performance in an OrganizationJournal of Social Sciences, 8
G. Gordon (2008)
Overall labour effectiveness: extending the principles of OEE to the workforce
P. Muchiri, L. Pintelon (2008)
Performance measurement using overall equipment effectiveness (OEE): literature review and practical application discussionInternational Journal of Production Research, 46
P. Chan, A. Kaka (2007)
Productivity improvements: understand the workforce perceptions of productivity firstPersonnel Review, 36
R. Takim, A. Akintoye (2005)
PERFORMANCE INDICATORS FOR SUCCESSFUL CONSTRUCTION PROJECT PERFORMANCE
Chen-Fu Chien, Jin-Tang Peng, Hsing-Chih Yu (2016)
Building energy saving performance indices for cleaner semiconductor manufacturing and an empirical studyComput. Ind. Eng., 99
Torbjörn Ylipää, A. Skoogh, Jon Bokrantz, M. Gopalakrishnan (2017)
Identification of maintenance improvement potential using OEE assessmentInternational Journal of Productivity and Performance Management, 66
M. Braglia, D. Castellano, M. Frosolini, M. Gallo (2018)
Overall material usage effectiveness (OME): a structured indicator to measure the effective material usage within manufacturing processesProduction Planning & Control, 29
Bhimasen Soragaon, N. Hiregoudar, S. Mallur (2012)
Development of a Conceptual Model for the Measurement of Overall Worker Effectiveness ( OWE ) In Discrete Manufacturing SMES
(2014)
Overview about person monitoring possibilities in workplace performance evaluation
P. Hines, M. Holweg, Nick Rich (2004)
Learning to evolve: A review of contemporary lean thinkingInternational Journal of Operations & Production Management, 24
JeongWook Son, Eddy Rojas (2011)
Impact of Optimism Bias Regarding Organizational Dynamics on Project Planning and ControlJournal of Construction Engineering and Management-asce, 137
M. Braglia, R. Gabbrielli, Leonardo Marrazzini (2019)
Overall Task Effectiveness: a new Lean performance indicator in engineer-to-order environmentInternational Journal of Productivity and Performance Management
International Journal of Productivity and Performance Management, 66
The paper proposes a new workforce effectiveness metric that is a sophisticated evolution of a pre-existing overall labour effectiveness (OLE) indicator. The KPI, named revised OLE (ROLE), provides a structured methodology to measure in a holistic way the losses relating to labour, maintaining some formal similitude to the overall equipment effectiveness (OEE)Design/methodology/approachA new structure of losses is proposed to overcome the drawbacks and the difficulties that usually affect the data collection stage, referring to directly measurable quantities or, when this is not the case, suggesting a viable method to quantify the loss. Besides, this approach facilitates the comprehension of labour-related issues, suggesting potential countermeasures. The novel ROLE indicator has been defined, based on this new structure, to evaluate the labour effectiveness in batch process industries. A real case study is provided, which explains the methodology and illustrates the capability of the corresponding KPI.FindingsThe present work analyses the labour performance indexes available in literature, with the aim of evidencing those aspects that can be properly observed and quantified and, at the same time, categorizing them to identify their possible drawbacks. A new structure of losses is derived, with respect to four different categories, which may help to measure the losses themselves more effectivelyOriginality/valueThe paper investigates some important KPIs dealing with labour performance and individuates some significant drawbacks. Then it suggests a new, inclusive structure of losses and a modified KPI that not only measures effectiveness but also allows to identify viable countermeasures.
International Journal of Productivity and Performance Management – Emerald Publishing
Published: Jun 25, 2021
Keywords: Labour performance; Workforce efficiency; Overall equipment effectiveness; Human resource management; Lean manufacturing
Read and print from thousands of top scholarly journals.
Already have an account? Log in
Bookmark this article. You can see your Bookmarks on your DeepDyve Library.
To save an article, log in first, or sign up for a DeepDyve account if you don’t already have one.
Copy and paste the desired citation format or use the link below to download a file formatted for EndNote
Access the full text.
Sign up today, get DeepDyve free for 14 days.
All DeepDyve websites use cookies to improve your online experience. They were placed on your computer when you launched this website. You can change your cookie settings through your browser.