Access the full text.
Sign up today, get DeepDyve free for 14 days.
B. Hwang, M. Shan, K. Looi (2018)
Key constraints and mitigation strategies for prefabricated prefinished volumetric constructionJournal of Cleaner Production, 183
J. Faludi, M. Lepech, G. Loisos (2012)
USING LIFE CYCLE ASSESSMENT METHODS TO GUIDE ARCHITECTURAL DECISION-MAKING FOR SUSTAINABLE PREFABRICATED MODULAR BUILDINGSJournal of Green Building, 7
M. Li, Gan Li, Yanqing Huang, L. Deng (2017)
Research on Investment Risk Management of Chinese Prefabricated Construction Projects Based on a System Dynamics ModelBuildings, 7
Mehrdad Arashpour, B. Abbasi, Mohammadreza Arashpour, M. Hosseini, R. Yang (2017)
Integrated management of on-site, coordination and off-site uncertainty: Theorizing risk analysis within a hybrid project settingInternational Journal of Project Management, 35
Bin Wang, Xiufang Wang, Jianzhong Wang (2012)
Construction and Empirical Analysis of Agricultural Science and Technology Enterprises Investment Risk Evaluation Index SystemIERI Procedia, 2
T. El-Diraby, J. Zhang (2006)
A semantic framework to support corporate memory management in building constructionAutomation in Construction, 15
W. Pan, R. Sidwell (2011)
Demystifying the cost barriers to offsite construction in the UKConstruction Management and Economics, 29
Jeya Dharmalingam, M. Eswaran (2018)
An Agent Based Intelligent Dynamic Vulnerability Analysis Framework for Critical SQLIA Attacks: Intelligent SQLIA Vulnerability Analyzer AgentInt. J. Intell. Inf. Technol., 14
Clyde Li, Jingke Hong, Fan Xue, G. Shen, Xiaoxiao Xu, Margaret Mok (2016)
Schedule risks in prefabrication housing production in Hong Kong: a social network analysisJournal of Cleaner Production, 134
S. Asgari, R. Awwad, A. Kandil, I. Odeh (2016)
Impact of considering need for work and risk on performance of construction contractors: An agent-based approachAutomation in Construction, 65
L. Aye, T. Ngo, R. Crawford, R. Gammampila, P. Mendis (2012)
Life cycle greenhouse gas emissions and energy analysis of prefabricated reusable building modulesEnergy and Buildings, 47
Chao Mao, Q. Shen, W. Pan, Kunhui Ye (2015)
Major Barriers to Off-Site Construction: The Developer’s Perspective in ChinaJournal of Management in Engineering, 31
L. Jaillon, C. Poon (2014)
Life cycle design and prefabrication in buildings: A review and case studies in Hong KongAutomation in Construction, 39
E. Bonabeau (2002)
Agent-based modeling: Methods and techniques for simulating human systemsProceedings of the National Academy of Sciences of the United States of America, 99
Z. Ren, C. Anumba (2004)
Multi-agent systems in construction–state of the art and prospectsAutomation in Construction, 13
Kivanc Karakas, I. Dikmen, M. Birgonul (2013)
Multiagent System to Simulate Risk-Allocation and Cost-Sharing Processes in Construction ProjectsJ. Comput. Civ. Eng., 27
R. Phanden, Ajai Jain, R. Verma (2011)
Integration of process planning and scheduling: a state-of-the-art reviewInternational Journal of Computer Integrated Manufacturing, 24
J. Wesz, C. Formoso, P. Tzortzopoulos (2018)
Planning and controlling design in engineered-to-order prefabricated building systemsEngineering, Construction and Architectural Management, 25
S. Christodoulou (2009)
Construction imitating ants: Resource-unconstrained scheduling with artificial antsAutomation in Construction, 18
Hyung-Jin Kim, K. Reinschmidt (2011)
Association of Risk Attitude with Market Diversification in the Construction BusinessJournal of Management in Engineering, 27
V. Nguyen, D. Hartmann, M. König (2012)
A distributed agent-based approach for simulation-based optimizationAdv. Eng. Informatics, 26
Clyde Li, Jingke Hong, Cheng Fan, Xiaoxiao Xu, G. Shen (2017)
Schedule delay analysis of prefabricated housing production: A hybrid dynamic approachJournal of Cleaner Production
Ying Wang, H. Hao (2015)
Damage Identification Scheme Based on Compressive SensingJ. Comput. Civ. Eng., 29
Wei Zhang, Ming-wai Lee, L. Jaillon, C. Poon (2018)
The hindrance to using prefabrication in Hong Kong's building industryJournal of Cleaner Production
S. Walczak (2018)
Society of Agents: A Framework for Multi-Agent Collaborative Problem SolvingInt. J. Intell. Inf. Technol., 14
Aicha Ghoulam, F. Barigou, Ghalem Belalem, F. Meziane (2018)
Query Expansion Using Medical Information Extraction for Improving Information Retrieval in French Medical DomainInt. J. Intell. Inf. Technol., 14
C. Anumba, Z. Ren, A. Thorpe, O. Ugwu, L. Newnham (2003)
Negotiation within a multi-agent system for the collaborative design of light industrial buildingsAdvances in Engineering Software, 34
Mehrdad Arashpour, R. Wakefield, E.W.M. Lee, R. Chan, M. Hosseini (2016)
Analysis of interacting uncertainties in on-site and off-site activities: Implications for hybrid constructionInternational Journal of Project Management, 34
S. Martinez, A. Jardón, J. Navarro, P. Gonzalez (2008)
Building industrialization: robotized assembly of modular productsAssembly Automation, 28
S. Isaac, R. Navon (2013)
A graph-based model for the identification of the impact of design changesAutomation in Construction, 31
Lei Duan, M. Dogru, Ulaş Özen, J. Beck (2012)
A negotiation framework for linked combinatorial optimization problemsAutonomous Agents and Multi-Agent Systems, 25
P. Lam, A. Chan, Francis Wong, Franky Wong (2007)
Constructability rankings of construction systems based on the analytical hierarchy processJournal of Architectural Engineering, 13
D. Gerber, Evangelos Pantazis, Alan Wang (2017)
A multi-agent approach for performance based architecture: Design exploring geometry, user, and environmental agencies in façadesAutomation in Construction, 76
Matt Watkins, Amlan Mukherjee, Nilufer Onder, K. Mattila (2009)
Using Agent-Based Modeling to Study Construction Labor Productivity as an Emergent Property of Individual and Crew InteractionsJournal of Construction Engineering and Management-asce, 135
Li-zi Luo, Chao Mao, Liyin Shen, Zhengdao Li (2015)
Risk factors affecting practitioners’ attitudes toward the implementation of an industrialized building system: A case study from ChinaEngineering, Construction and Architectural Management, 22
B. Hadikusumo, Sataporn Petchpong, C. Charoenngam (2005)
Construction material procurement using Internet-based agent systemAutomation in Construction, 14
E. Obonyo (2002)
APRON: Agent-based specification and procurement of construction products
Jeongin Koo, Y. Kim, Byung-In Kim (2012)
Estimating the impact of residents with disabilities on the evacuation in a high-rise building: A simulation studySimul. Model. Pract. Theory, 24
R. Awwad, S. Asgari, A. Kandil (2015)
Developing a Virtual Laboratory for Construction Bidding Environment Using Agent-Based ModelingJ. Comput. Civ. Eng., 29
M. Mahmoud, M. Ahmad, M. Yusoff, A. Idrus (2015)
Automated Multi-agent Negotiation Framework for the Construction Domain
F. Taillandier, P. Taillandier, Esra Tepeli, D. Breysse, R. Mehdizadeh, Fadi Khartabil (2015)
A multi-agent model to manage risks in construction project (SMACC)Automation in Construction, 58
Yuwei Yan, Jian Zhang, Xiaomeng Ma (2019)
Modeling of Agent-Based Complex Network to Detect the Trust of Investors in P2P PlatformInt. J. Intell. Inf. Technol., 15
R. Dzeng, Yu-Chun Lin (2004)
Intelligent agents for supporting construction procurement negotiationExpert Syst. Appl., 27
C. Anumba, O. Ugwu, L. Newnham, A. Thorpe (2002)
Collaborative design of structures using intelligent agentsAutomation in Construction, 11
Jian Tan, Guoqiang Jiang, Zuogong Wang (2019)
Evolutionary Game Model of Information Sharing Behavior in Supply Chain Network With Agent-Based SimulationInt. J. Intell. Inf. Technol., 15
PurposeThe purpose of this paper is to develop a multi-agent-based model for quantitatively measuring how the design change management strategies improve project performance.Design/methodology/approachBased on questionnaires and interviews, this paper investigates the coordination mechanism of risks due to design changes in prefabricated construction (PC) projects. Combined with all the variables related with design change risks, a multi-agent-based simulation model is proposed to evaluate the design change management effect.FindingsThe coordination mechanism between design change factors, design change events, risk consequence and management strategy in PC projects is described and then the simulation-based design change management mechanism in PC projects is used to assess the effect of management strategies under dynamic scenarios.Originality/valuePC projects have rapidly increased in recent years due to the advantages of fast construction, high quality and labor savings. Different from traditional on-site construction, the impact and risk from design changes are likely to be greater due to the prefabricated project being multi-stage, highly interactive and complex. The simulations presented in this paper make it possible to test different design change management strategies in order to study their effectiveness and support managerial decision making.
Engineering Construction & Architectural Management – Emerald Publishing
Published: Aug 5, 2019
Read and print from thousands of top scholarly journals.
Already have an account? Log in
Bookmark this article. You can see your Bookmarks on your DeepDyve Library.
To save an article, log in first, or sign up for a DeepDyve account if you don’t already have one.
Copy and paste the desired citation format or use the link below to download a file formatted for EndNote
Access the full text.
Sign up today, get DeepDyve free for 14 days.
All DeepDyve websites use cookies to improve your online experience. They were placed on your computer when you launched this website. You can change your cookie settings through your browser.