Fangxiao Liu, A. Jallow, C. Anumba, Dinghao Wu (2014)
A Framework for Integrating Change Management with Building Information Modeling
Strategic Management Journal, 32
Forum Qualitative Sozialforschung/forum: Qualitative Social Research, 3
A. Davies, T. Brady (2016)
Explicating the dynamics of project capabilitiesInternational Journal of Project Management, 34
(2017)
National BIM Report 2016
Frances Milliken, E. Morrison, P. Hewlin (2003)
An Exploratory Study of Employee Silence: Issues that Employees Don’t Communicate Upward and Why*Journal of Management Studies, 40
Yu-Cheng Lin, Hui-Hsuan Yang (2018)
A Framework for Collaboration Management of BIM Model Creation in Architectural ProjectsJournal of Asian Architecture and Building Engineering, 17
Lanciné Doumbouya, Guoping Gao, Changsheng Guan (2016)
Adoption of the Building Information Modeling (BIM) for Construction Project Effectiveness: The Review of BIM BenefitsAmerican Journal of Civil Engineering and Architecture, 4
F. Akbar (2013)
What affects students’ acceptance and use of technology? Dietrich College Honors Theses
Built Environment, 8
Q. Hao, W. Shen, J. Neelamkavil, Russ Thomas (2008)
CHANGE MANAGEMENT IN CONSTRUCTION PROJECTS
Ahmad Jamil, M. Fathi (2018)
Contractual challenges for BIM-based construction projects: a systematic reviewBuilt Environment Project and Asset Management
Barry Gledson, D. Greenwood, P. Routledge, Richard Watson, Paul Woddy (2016)
Preparing to work in level 2 BIM: an innovative approach to a training and educational need
Stuart Green, C. Kao, G. Larsen (2010)
Contextualist Research: Iterating between Methods While Following an Empirically Grounded ApproachJournal of Construction Engineering and Management-asce, 136
D. Bryde, Martí Broquetas, Jurgen Volm (2013)
The project benefits of Building Information Modelling (BIM)International Journal of Project Management, 31
Kristen Barlish, K. Sullivan (2012)
How To Measure the Benefits of BIM - A Case Study ApproachAutomation in Construction, 24
Eissa Alreshidi, M. Mourshed, Y. Rezgui (2017)
Factors for effective BIM governanceJournal of building engineering, 10
C. Farnsworth, Simon Beveridge, K. Miller, Jay Christofferson (2015)
Application, Advantages, and Methods Associated with Using BIM in Commercial ConstructionInternational Journal of Construction Education and Research, 11
J. Eichel (2016)
The Theory And Practice Of Change Management
S. Salimi, Mohammed Mawlana, A. Hammad (2018)
Performance analysis of simulation-based optimization of construction projects using High Performance ComputingAutomation in Construction, 87
S. Karimidorabati, C. Haas, J. Gray (2016)
Evaluation of automation levels for construction change managementEngineering, Construction and Architectural Management, 23
C. Liyanage (2016)
Construction in a changing world, 6
D. Hughes, Trefor Williams, Z. Ren (2012)
Is incentivisation significant in ensuring successful partnered projectsEngineering, Construction and Architectural Management, 19
Forest Peterson, T. Hartmann, R. Fruchter, M. Fischer (2011)
Teaching construction project management with BIM support: Experience and lessons learnedAutomation in Construction, 20
(2017)
ProjectsDigital Construction Resource
Duncan Smith (1983)
ProjectsRestoration & Management Notes, 1
Anne Anderson, Andrew Marsters, C. Dossick, Gina Neff (2012)
Construction to Operations Exchange: Challenges of Implementing COBie and BIM in a Large Owner Organization
SangHyun Lee, F. Peña-Mora (2007)
Understanding and managing iterative error and change cycles in constructionSystem Dynamics Review, 23
Paul Coates, Yusuf Arayici, K. Koskela, M. Kagioglou, C. Usher, K. O’Reilly (2010)
The key performance indicators of the BIM implementation process
J. Landis, G. Koch (1977)
The measurement of observer agreement for categorical data.Biometrics, 33 1
S. Azhar (2011)
Building Information Modeling (BIM): Trends, Benefits, Risks, and Challenges for the AEC IndustryLeadership and Management in Engineering, 11
Peter Vogelius, Kresten Storgaard (2016)
Proceedings of the 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester. UK, Association of Researchers in Construction Management
Risto Tulenheimo (2015)
Challenges of Implementing New Technologies in the World of BIM – Case Study from Construction Engineering Industry in FinlandProcedia. Economics and finance, 21
(2015)
Building information modelling (BIM): now and beyond
A. Kennedy (2004)
Change Management
R. Eadie, M. Browne, H. Odeyinka, C. McKeown, Sean McNiff (2015)
A survey of current status of and perceived changes required for BIM adoption in the UK, 5
A. Ghaffarianhoseini, J. Tookey, Amirhosein Ghaffarianhoseini, N. Naismith, S. Azhar, Olia Efimova, K. Raahemifar (2017)
Building Information Modelling (BIM) uptake: Clear benefits, understanding its implementation, risks and challengesRenewable & Sustainable Energy Reviews, 75
K. Newton, N. Chileshe (2012)
AWARENESS, USAGE AND BENEFITS OF BUILDING INFORMATION MODELLING (BIM) ADOPTION - THE CASE OF THE SOUTH AUSTRALIAN CONSTRUCTION ORGANISATIONS
(2002)
September. Constructivist grounded theory? In Forum qualitative sozialforschung/forum
Fatema Akbar (2013)
What affects students’ acceptance and use of technology?
I. Motawa, C. Anumba, SangHyun Lee, F. Peña-Mora (2007)
An integrated system for change management in constructionAutomation in Construction, 16
(2018)
The Royal hospital
A. Bataw, M. Burrows, R. Kirkham (2014)
THE CHALLENGES OF ADOPTING BUILDING INFORMATION MODELLING (BIM) PRINCIPLES WITHIN SMALL TO MEDIUM SIZED ENTERPRISES (SMEs)
Ivan Tubert-Brohman, W. Sherman, Matthew Repasky, T. Beuming (2013)
Improved Docking of Polypeptides with GlideJournal of chemical information and modeling, 53 7
(2018)
BIM Level 2 Benefits measurement methodology
(2016)
Developing the standards, tools and training that will drive the uptake of open BIM
(2017)
Case Study: 39 Victoria Street, London Willmott Dixon’s Inside Job For DOH
R. Stepp, R. Michalski (1986)
Conceptual Clustering of Structured Objects: A Goal-Oriented ApproachArtif. Intell., 28
J. Zeb, T. Froese, D. Vanier (2015)
An ontology-supported asset information integrator system in infrastructure management, 5
A. Elmualim, J. Gilder (2014)
BIM: innovation in design management, influence and challenges of implementationArchitectural Engineering and Design Management, 10
Enzhao Hu, Yang Liu (2008)
IT Project Change Management2008 International Symposium on Computer Science and Computational Technology, 1
F. Khosrowshahi, Yusuf Arayici (2012)
Roadmap for implementation of BIM in the UK construction industryEngineering, Construction and Architectural Management, 19
Chun-Sung Chen, Y. Tsui, R. Dzeng, Wei-Chih Wang (2014)
Application of project-based change management in construction: a case studyJournal of Civil Engineering and Management, 21
D. Månsson, G. Lindahl (2016)
BIM performance and capability
David Hannah, Brenda Lautsch (2011)
Counting in Qualitative Research: Why to Conduct it, When to Avoid it, and When to Closet itJournal of Management Inquiry, 20
Yeliz Gokuc, D. Arditi (2017)
Adoption of BIM in architectural design firmsArchitectural Science Review, 60
Ke Chen, Weisheng Lu, Hongdi Wang, Yuhan Niu, G. Huang (2017)
Naming Objects in BIM: A Convention and a Semiautomatic ApproachJournal of Construction Engineering and Management-asce, 143
J. Whyte, Angelos Stasis, C. Lindkvist (2016)
Managing change in the delivery of complex projects: Configuration management, asset information and 'big data'International Journal of Project Management, 34
S. Talebi (2014)
Exploring advantages and challenges of adaptationand implementation of BIM in project life cycle
Malak Hattab, F. Hamzeh (2015)
Using social network theory and simulation to compare traditional versus BIM–lean practice for design error managementAutomation in Construction, 52
Constance Helfat (2011)
Untangling dynamic and operational capabilities: strategy for the (n)ever-changing worldStrategic Direction, 28
B. Glaser (2002)
Constructivist Grounded Theory, 3
Yusuf Arayici, Paul Coates, L. Koskela, M. Kagioglou, C. Usher, K. O’Reilly (2011)
Technology adoption in the BIM implementation for lean architectural practiceAutomation in Construction, 20
Lijuan Chen, Hanbin Luo (2014)
A BIM-based construction quality management model and its applicationsAutomation in Construction, 46
M. Engwall (2002)
The Futile Dream for the Perfect Goal
Brad Hardin (2009)
BIM and Construction Management: Proven Tools, Methods, and Workflows
Bilge Erdogan, C. Anumba, N. Bouchlaghem, Y. Nielson (2005)
Change management in construction: the current context
The purpose of this paper is to validate perceived benefits and challenges of managing change in Building Information Modelling (BIM) Level 2 projects and to further explore the opportunities for enhancing the benefits and reducing the challenges. This research is timely because, hitherto, the benefits and challenges of managing change in BIM Level 2 remained largely unvalidated and the opportunities for enhancing the benefits and reducing challenges remained relatively unexplored.Design/methodology/approachA combination of a questionnaire survey and interviews with BIM Level 2 practitioners in the UK was employed in this study. In all, 41 responses were received from the questionnaire survey and ten subsequent interviews with BIM practitioners were carried out to explore opportunities for reducing challenges and increasing benefits of managing change in BIM Level 2 projects.FindingsThe study confirms benefits and challenges of managing change in BIM Level 2 projects identified and synthesised from literature, a much needed validation. Additional benefits and challenges were also identified in this study, such as cost saving and risk reduction (benefits) and social dimension issues in the BIM Level 2 processes (challenges). Opportunities identified to enhance benefits and reduce challenges were mainly socially driven, and were either reactive or proactive in nature.Research limitations/implicationsOpportunities for reducing challenges and increasing benefits identified from this research can inform the change management processes in BIM-Level 2.Practical implicationsThe findings provide concrete basis for shaping BIM Level 2 change management processes and requirements.Social implicationsThe identification of behaviours as shaping the social requirements for BIM-Level 2 confirms the need for a socio-technical approach to successful BIM implementation.Originality/valueThe identification of behaviours as shaping the social requirements for BIM Level 2 confirms the need for a socio-technical approach to successful BIM implementation.
Built Environment Project and Asset Management – Emerald Publishing
Published: Sep 20, 2019
Keywords: Behaviour; Change management; Benefits; Challenges; BIM; Opportunities
Read and print from thousands of top scholarly journals.
Already have an account? Log in
Bookmark this article. You can see your Bookmarks on your DeepDyve Library.
To save an article, log in first, or sign up for a DeepDyve account if you don’t already have one.
Copy and paste the desired citation format or use the link below to download a file formatted for EndNote
Access the full text.
Sign up today, get DeepDyve free for 14 days.
All DeepDyve websites use cookies to improve your online experience. They were placed on your computer when you launched this website. You can change your cookie settings through your browser.