Access the full text.
Sign up today, get DeepDyve free for 14 days.
M. Golparvar-Fard, F. Peña-Mora, Carlos Arboleda, SangHyun Lee (2009)
Visualization of construction progress monitoring with 4D simulation model overlaid on time-lapsed photographsJournal of Computing in Civil Engineering, 23
Hang Yan, Nan Yang, Yi Peng, Yitian Ren (2020)
Data mining in the construction industry: Present status, opportunities, and future trendsAutomation in Construction, 119
Bin Wang, Haijiang Li, Y. Rezgui, A. Bradley, H. Ong (2014)
BIM Based Virtual Environment for Fire Emergency EvacuationThe Scientific World Journal, 2014
F. Rahimian, Veselina Chavdarova, Stephen Oliver, Farhad Chamo (2019)
OpenBIM-Tango integrated virtual showroom for offsite manufactured production of self-build housingAutomation in Construction
Safety Science, 87
E. Noorzai, Kobra Jafari, Leila Naeni (2020)
Lessons Learned on Selecting the Best Mass Housing Method Based on Performance Evaluation Criteria in IranInternational Journal of Construction Education and Research, 18
Shirui Peng, G. Su, Jianguo Chen, Peng Du (2017)
Design of an IoT-BIM-GIS Based Risk Management System for Hospital Basic Operation2017 IEEE Symposium on Service-Oriented System Engineering (SOSE)
University of Huddersfield Repository Construction risk knowledge management in BIM using ontology and semantic web technology
Kobra Jafari, E. Noorzai (2021)
Selecting the Most Appropriate Project Manager to Improve the Performance of the Occupational Groups in Road Construction Projects in Warm RegionsJournal of Construction Engineering and Management-asce, 147
E. Noorzai, A. Hosseini, Kobra Jafari, Mohammadhossein Aghaeipoor (2017)
Providing a Model to Select an Optimum Multifamily Housing Method in IranJournal of Architectural Engineering, 23
R. Woodhead, P. Stephenson, Denise Morrey (2018)
Digital construction: From point solutions to IoT ecosystemAutomation in Construction
Sevilay Demirkesen, B. Ozorhon (2017)
Impact of integration management on construction project management performanceInternational Journal of Project Management, 35
S. Abbasi, Katayoon Taghizade, E. Noorzai (2020)
BIM-Based Combination of Takt Time and Discrete Event Simulation for Implementing Just in Time in Construction Scheduling under ConstraintsJournal of Construction Engineering and Management-asce, 146
Farzaneh Moshtaghian, M. Golabchi, E. Noorzai (2020)
A framework to dynamic identification of project risks, 9
E. Noorzai (2021)
Public–Private Partnership Risks in Conflict Zones and Solutions: Case Study for AfghanistanJournal of Infrastructure Systems, 27
A. Darko, A. Chan, Yang Yang, M. Tetteh (2020)
Building information modeling (BIM)-based modular integrated construction risk management - Critical survey and future needsComput. Ind., 123
Majid Jalal, Tayebe Roushan, E. Noorzai, Maryam Alizadeh (2020)
A BIM-based construction claim management model for early identification and visualization of claims
Ruodan Lu, I. Brilakis (2019)
Digital twinning of existing reinforced concrete bridges from labelled point clustersAutomation in Construction
T. Omar, M. Nehdi (2016)
Data acquisition technologies for construction progress trackingAutomation in Construction, 70
P. Lee, Liping Zheng, T. Lo, Danbing Long (2020)
A Risk Management System for Deep Excavation Based on BIM-3DGIS Framework and Optimized Grey Verhulst ModelKSCE Journal of Civil Engineering, 24
Y. Zou, A. Kiviniemi, Stephen Jones (2017)
A review of risk management through BIM and BIM-related technologiesSafety Science, 97
Bin Chen, Xu Wang, Dezhang Sun, XuanRong Xie (2014)
Integrated System of Structural Health Monitoring and Intelligent Management for a Cable-Stayed BridgeThe Scientific World Journal, 2014
Xuejiao Xing, B. Zhong, Hanbin Luo, Heng Li, Haitao Wu (2019)
Ontology for safety risk identification in metro constructionComput. Ind., 109
Y. Zou, A. Kiviniemi, Stephen Jones, J. Walsh (2019)
Risk Information Management for Bridges by Integrating Risk Breakdown Structure into 3D/4D BIMKSCE Journal of Civil Engineering, 23
J. Tah, Vaughan Carr (2000)
Information modelling for a construction project risk management systemEngineering, Construction and Architectural Management, 7
E. Noorzai, Kobra Jafari, Rouhallah Heshmatnezhad, B. Vahedi (2016)
Implementing AHP Approach to Select an Appropriate Financing Method for PPP Highway Projects in Iran
(2007)
Building and housing research center
Kobra Jafari, E. Noorzai, M. Hosseini (2021)
Assessing the capabilities of computing features in addressing the most common issues in the AEC industryConstruction Innovation: Information, Process, Management
Jaehyun Park, Hubo Cai (2017)
WBS-based dynamic multi-dimensional BIM database for total construction as-built documentationAutomation in Construction, 77
E. Jaselskis, Tarek El-Misalami (2003)
Implementing Radio Frequency Identification in the Construction ProcessJournal of Construction Engineering and Management-asce, 129
Meng Li, Hongliang Yu, Ping Liu (2018)
An automated safety risk recognition mechanism for underground construction at the pre-construction stage based on BIMAutomation in Construction
Mohamed El-Karim, Omar Nawawy, A. Abdel-Alim (2017)
Identification and assessment of risk factors affecting construction projectsHBRC Journal, 13
Sijie Zhang, J. Teizer, Nipesh Pradhananga, C. Eastman (2015)
Workforce location tracking to model, visualize and analyze workspace requirements in building information models for construction safety planningAutomation in Construction, 60
F. Rahimian, S. Seyedzadeh, Stephen Oliver, Dr Rodriguez, N. Dawood (2020)
On-demand monitoring of construction projects through a game-like hybrid application of BIM and machine learningAutomation in Construction
J. Teizer, D. Lao, M. Šofer (2007)
Rapid Automated Monitoring of Construction Site Activities Using Ultra-Wide Band
(2009)
ASTMD 2488-09a standard practice for description and identification of soils (visual-manual procedure)
This research has been conducted with a view to creating a framework to integrate risk management based on building information modeling (BIM) information.Design/methodology/approachIn this research, all the information related to the construction of a residential project including 3D, 4D and 5D BIM models and the execution and control phases information was collected, and the risk list was determined for each activity accordingly.FindingsThe present study has suggested a framework for risk management in order to optimize project changes.Originality/valueThe lack of integration between 3D, 4D and 5D modeling besides execution information is a fundamental problem in many projects. The gap between these two groups of information will lead to improper management and late decisions, eventually imposing unforeseen delays and cost overruns. Risk management by the means of adopting a new approach has been addressed in recent studies using new methods, such as BIM and its associated technologies, some of which were mentioned in the review of theoretical literature in this research.
Engineering Construction & Architectural Management – Emerald Publishing
Published: May 24, 2023
Keywords: Building information modeling; Risk management; Integration; Project management
Read and print from thousands of top scholarly journals.
Already have an account? Log in
Bookmark this article. You can see your Bookmarks on your DeepDyve Library.
To save an article, log in first, or sign up for a DeepDyve account if you don’t already have one.
Copy and paste the desired citation format or use the link below to download a file formatted for EndNote
Access the full text.
Sign up today, get DeepDyve free for 14 days.
All DeepDyve websites use cookies to improve your online experience. They were placed on your computer when you launched this website. You can change your cookie settings through your browser.