Access the full text.
Sign up today, get DeepDyve free for 14 days.
Khaled El-Abidi, G. Ofori, S. Zakaria, A. Aziz (2019)
Using Prefabricated Building to Address Housing Needs in Libya: A Study based on Local Expert PerspectivesArabian Journal for Science and Engineering, 44
(2021)
Experimental and numerical investigation of load bearing capacity of thinned end precast purlin beams and solution proposals
V. Tam, I. Fung, M. Sing, S. Ogunlana (2015)
Best practice of prefabrication implementation in the Hong Kong public and private sectorsJournal of Cleaner Production, 109
N. Dawood, R. Neale (1993)
A capacity planning model for precast concrete building productsBuilding and Environment, 28
Juan Du, Y. Xue, V. Sugumaran, Min Hu, Peng Dong (2022)
Improved biogeography-based optimization algorithm for lean production scheduling of prefabricated componentsEngineering, Construction and Architectural Management
Wen Yi, Shuaian Wang, A. Zhang (2019)
Optimal transportation planning for prefabricated products in constructionComputer‐Aided Civil and Infrastructure Engineering, 35
Hong Zhang, Lu Yu (2020)
Dynamic transportation planning for prefabricated component supply chainEngineering, Construction and Architectural Management, 27
I. Wuni, G. Shen (2020)
Critical success factors for management of the early stages of prefabricated prefinished volumetric construction project life cycleEngineering, Construction and Architectural Management, 27
X. Qi, Q. Du, P. Zou, Ning Huang (2023)
Developing a weighted synergy network–based model for selecting prefabricated construction servicesEngineering, Construction and Architectural Management
Zhaojing Wang, Hao Hu (2017)
Improved Precast Production-Scheduling Model Considering the Whole Supply ChainJ. Comput. Civ. Eng., 31
Yuan Fang, S. Ng (2019)
Genetic algorithm for determining the construction logistics of precast componentsEngineering, Construction and Architectural Management
Chao Mao, Chao Mao, Fangyun Xie, L. Hou, Peng Wu, J. Wang, Xiangyu Wang (2016)
Cost analysis for sustainable off-site construction based on a multiple-case study in ChinaHabitat International, 57
De-ming Lei (2012)
Minimizing makespan for scheduling stochastic job shop with random breakdownAppl. Math. Comput., 218
Zhaojing Wang, Hao Hu, J. Gong (2018)
Framework for modeling operational uncertainty to optimize offsite production scheduling of precast componentsAutomation in Construction, 86
W. Chan, Hao Hu (2001)
An application of genetic algorithms to precast production schedulingComputers & Structures, 79
F. Xiong, Siyu Chen, Zongfang Ma, Linlin Li (2022)
Approximate model and algorithms for precast supply chain scheduling problem with time-dependent transportation timesInternational Journal of Production Research, 61
Pejman Sabet, H. Chong (2019)
Interactions between building information modelling and off-site manufacturing for productivity improvementInternational Journal of Managing Projects in Business
Yingbo Ji, K. Qi, Yuan Qi, Yan Li, Hong Li, Z. Lei, Yan Liu (2020)
BIM-based life-cycle environmental assessment of prefabricated buildingsEngineering, Construction and Architectural Management, 27
Shuqiang Wang, Jia-Wei Tang, Y. Zou, Qihui Zhou (2020)
Research on production process optimization of precast concrete component factory based on value stream mappingEngineering, Construction and Architectural Management
Tongguang Si, Hong Li, Z. Lei, Hexu Liu, SangHyeok Han (2021)
A Dynamic Just-in-Time Component Delivery Framework for Off-Site ConstructionAdvances in Civil Engineering, 2021
C. Ko, Shu-fan Wang (2011)
Precast production scheduling using multi-objective genetic algorithmsExpert Syst. Appl., 38
W. Chan, Hao Hu (2002)
Production Scheduling for Precast Plants using a Flow Shop Sequencing ModelJournal of Computing in Civil Engineering, 16
Zhiliang Ma, Zhitian Yang, Shilong Liu, Song Wu (2018)
Optimized rescheduling of multiple production lines for flowshop production of reinforced precast concrete componentsAutomation in Construction
Xiaojiang Yang (2022)
Optimization Algorithm of Logistics Transportation Cost of Prefabricated Building Components for Project ManagementJournal of Mathematics
Tanmay Vasishta (2019)
Comparative life cycle assesment (LCA) and life cycle cost analysis (LCCA) of precast and cast–IN–place buildings in United StatesJournal of Building Engineering
Juan Du, Peng Dong, V. Sugumaran, D. Castro-Lacouture (2020)
Dynamic decision support framework for production scheduling using a combined genetic algorithm and multiagent modelExpert Systems, 38
Lihui Huang, Roshan Pradhan, Souravik Dutta, Yiyu Cai (2022)
BIM4D-based scheduling for assembling and lifting in precast-enabled constructionAutomation in Construction
Suryani Ahmad, R. Soetanto, C. Goodier (2019)
Lean approach in precast concrete component productionBuilt Environment Project and Asset Management
G. Tumminia, F. Guarino, S. Longo, M. Ferraro, M. Cellura, V. Antonucci (2018)
Life cycle energy performances and environmental impacts of a prefabricated building moduleRenewable and Sustainable Energy Reviews
Yiran Dan, Guiwen Liu, Yan Fu (2021)
Optimized flowshop scheduling for precast production considering process connection and blockingAutomation in Construction, 125
Jingke Hong, G. Shen, Zhengdao Li, Boyu Zhang, Wanqiu Zhang (2018)
Barriers to promoting prefabricated construction in China : a cost-benefit analysisJournal of Cleaner Production, 172
Zhitian Yang, Zhiliang Ma, Song Wu (2016)
Optimized flowshop scheduling of multiple production lines for precast productionAutomation in Construction, 72
Minhao Ruan, Feng Xu (2022)
IMPROVED EIGHT-PROCESS MODEL OF PRECAST COMPONENT PRODUCTION SCHEDULING CONSIDERING RESOURCE CONSTRAINTSJOURNAL OF CIVIL ENGINEERING AND MANAGEMENT
Taehoon Kim, Yong-woo Kim, H. Cho (2020)
A simulation-based dynamic scheduling model for curtain wall production considering construction planning reliabilityJournal of Cleaner Production
Taehoon Kim, Yong-woo Kim, Hunhee Cho (2020)
Dynamic production scheduling model under due date uncertainty in precast concrete constructionJournal of Cleaner Production
M. Arashpour, R. Wakefield, B. Abbasi, Mohammadreza Arashpour, Reza Hosseini (2018)
Optimal process integration architectures in off-site construction: Theorizing the use of multi-skilled resourcesArchitectural Engineering and Design Management, 14
Zhaojing Wang, Yisheng Liu, Hao Hu, L. Dai (2021)
Hybrid Rescheduling Optimization Model under Disruptions in Precast Production Considering Real-World EnvironmentJournal of Construction Engineering and Management-asce, 147
Production and transportation of precast components, as two continuous service stages of a precast plant, play an important role in meeting customer needs and controlling costs. However, there is still a lack of production and transportation scheduling methods that comprehensively consider delivery timeliness and transportation economy. This article aims to study the integrated scheduling optimization problem of in-plant flowshop production and off-plant transportation under the consideration of practical constraints of customer order delivery time window, and seek an optimal scheduling method that balances delivery timeliness and transportation economy.Design/methodology/approachIn this study, an integrated scheduling optimization model of flowshop production and transportation for precast components with delivery time windows is established, which describes the relationship between production and transportation and handles transportation constraints under the premise of balancing delivery timeliness and transportation economy. Then a genetic algorithm is designed to solve this model. It realizes the integrated scheduling of production and transportation through double-layer chromosome coding. A program is designed to realize the solution process. Finally, the validity of the model is proved by the calculation of actual enterprise data.FindingsThe optimized scheduling scheme can not only meet the on-time delivery, but also improve the truck loading rate and reduce the total cost, composed of early cost in plant, delivery penalty cost and transportation cost. In the model validation, the optimal scheduling scheme uses one less truck than the traditional EDD scheme (saving 20% of the transportation cost), and the total cost can be saved by 17.22%.Originality/valueThis study clarifies the relationship between the production and transportation of precast components and establishes the integrated scheduling optimization model and its solution algorithm. Different from previous studies, the proposed optimization model can balance the timeliness and economy of production and transportation for precast components.
Engineering Construction & Architectural Management – Emerald Publishing
Published: Jul 25, 2024
Keywords: Prefabricated building; Precast production; Precast transportation; Integrated scheduling; Delivery time window
Read and print from thousands of top scholarly journals.
Already have an account? Log in
Bookmark this article. You can see your Bookmarks on your DeepDyve Library.
To save an article, log in first, or sign up for a DeepDyve account if you don’t already have one.
Copy and paste the desired citation format or use the link below to download a file formatted for EndNote
Access the full text.
Sign up today, get DeepDyve free for 14 days.
All DeepDyve websites use cookies to improve your online experience. They were placed on your computer when you launched this website. You can change your cookie settings through your browser.