R. Sweis, Alireza Moarefi, Seyyed-Mahmoud Hoseini-Amiri, Soad Moarefi (2019)
Delay factors of the schedule of strategic industrial projectsInternational Journal of Building Pathology and Adaptation
A. Odeh, Hussien Battaineh (2002)
Causes of construction delay: traditional contractsInternational Journal of Project Management, 20
D. Okpala, A. Aniekwu (1988)
Causes of High Costs of Construction in NigeriaJournal of Construction Engineering and Management-asce, 114
Adriana Oliveros, A. Fayek (2005)
Fuzzy Logic Approach for Activity Delay Analysis and Schedule UpdatingJournal of Construction Engineering and Management-asce, 131
D. Singh, R. Tiong (2005)
A Fuzzy Decision Framework for Contractor SelectionJournal of Construction Engineering and Management-asce, 131
M. El-Razek, H. Bassioni, A. Mobarak (2008)
Causes of Delay in Building Construction Projects in EgyptJournal of Construction Engineering and Management-asce, 134
C. Semple, Francis Hartman, George Jergeas (1994)
Construction Claims and Disputes: Causes and Cost/Time OverrunsJournal of Construction Engineering and Management-asce, 120
F. Ling, Swee Chan, E. Chong, Lee Ee (2004)
Predicting Performance of Design-Build and Design-Bid-Build ProjectsJournal of Construction Engineering and Management-asce, 130
S. Assaf, M. Al-Khalil, Muhammad Al-Hazmi (1995)
Causes of Delay in Large Building Construction ProjectsJournal of Management in Engineering, 11
L. Zadeh (1996)
Fuzzy sets
S. Ogunlana, Krit Promkuntong, Vithool Jearkjirm (1996)
Construction delays in a fast-growing economy: Comparing Thailand with other economiesInternational Journal of Project Management, 14
M. Sambasivan, Y. Soon (2007)
Causes and effects of delays in Malaysian construction industryInternational Journal of Project Management, 25
M.A. Al-Ghafly (1995)
Delay in the construction of public utility projects in Saudi Arabia
M. Marzouk, Ahmed El-Dokhmasey, M. El-Said (2008)
Assessing Construction Engineering-Related Delays: Egyptian PerspectiveJournal of Professional Issues in Engineering Education and Practice, 134
Cenk Budayan, I. Dikmen, M. Birgonul, Aydın Ghaziani (2018)
A Computerized Method for Delay Risk Assessment Based on Fuzzy Set Theory using MS Project™KSCE Journal of Civil Engineering, 22
Prasad K.V., V. V, V. R., N. Bhat (2019)
Analysis of causes of delay in Indian construction projects and mitigation measuresJournal of Financial Management of Property and Construction
(1997)
The causes and effects of construction delays on completion cost of housing projects in Nigeria
R. Aziz, Asmaa Abdel-Hakam (2016)
Exploring delay causes of road construction projects in Egyptalexandria engineering journal, 55
P. González, V. González, K. Molenaar, F. Orozco (2014)
Analysis of Causes of Delay and Time Performance in Construction ProjectsJournal of Construction Engineering and Management-asce, 140
I. Dikmen, M. Birgonul, S. Han (2007)
Using fuzzy risk assessment to rate cost overrun risk in international construction projectsInternational Journal of Project Management, 25
Daniel Chan, M. Kumaraswamy (1997)
A comparative study of causes of time overruns in Hong Kong construction projectsInternational Journal of Project Management, 15
M. Bajjou, A. Chafi (2018)
Empirical study of schedule delay in Moroccan construction projectsInternational Journal of Construction Management, 20
M. Al-Khalil, Mohammed Al-Ghafly (1999)
Important causes of delay in public utility projects in Saudi ArabiaConstruction Management and Economics, 17
P. Kaming, P. Olomolaiye, G. Holt, F. Harris (1997)
Factors influencing construction time and cost overruns on high-rise projects in IndonesiaConstruction Management and Economics, 15
F. Peña-Mora, Sangwon Han, SangHyun Lee, Moonseo Park (2008)
Strategic-Operational Construction Management: Hybrid System Dynamics and Discrete Event ApproachJournal of Construction Engineering and Management-asce, 134
D. Arditi, Shruti Nayak, Atilla Damci (2017)
Effect of organizational culture on delay in constructionInternational Journal of Project Management, 35
Arshi Faridi, S. El-Sayegh (2006)
Significant factors causing delay in the UAE construction industryConstruction Management and Economics, 24
S. Assaf, Sadiq Al-Hejji (2006)
Causes of delay in large construction projectsInternational Journal of Project Management, 24
I. Adhikari, Soo-Yong Kim, Young-Dai Lee (2006)
Selection of Appropriate Schedule Delay Analysis Method: Analytical Hierarchy Process (AHP)2006 Technology Management for the Global Future - PICMET 2006 Conference, 2
A. Al‐Momani (2000)
Construction delay: a quantitative analysisInternational Journal of Project Management, 18
Ghaleb Sweis, R. Sweis, Ayman Hammad, A. Shboul (2008)
Delays in construction projects: The case of JordanInternational Journal of Project Management, 26
(2003)
Schedule delay analysis; is there agreement
Y. Zidane, Agnar Johansen, B. Andersen, E. Hoseini (2015)
Time-thieves and Bottlenecks in the Norwegian Construction Projects☆Procedia. Economics and finance, 21
Bonga Ntshangase, Nien-Tsu Tuan (2019)
A systemic inquiry into the delay factors in South African electrical distribution projectsInternational Journal of Managing Projects in Business
D. Arditi, G. Akan, San Gurdamar (1985)
Reasons for delays in public projects in TurkeyConstruction Management and Economics, 3
G. Beriha, B. Patnaik, S. Mahapatra, Saumyakant Padhee (2012)
Assessment of safety performance in Indian industries using fuzzy approachExpert Syst. Appl., 39
Information and Control, 8
Muhammad Islam, B. Suhariadi (2018)
Construction delays in privately funded large building projects in BangladeshAsian Journal of Civil Engineering, 19
Ching-Torng Lin, Ying-Te Chen (2004)
Bid/no-bid decision-making – a fuzzy linguistic approachInternational Journal of Project Management, 22
A. El-Kholy (2019)
Exploring the best ANN model based on four paradigms to predict delay and cost overrun percentages of highway projectsInternational Journal of Construction Management, 21
M. Hegab, Gary Smith (2007)
Delay Time Analysis in Microtunneling ProjectsJournal of Construction Engineering and Management-asce, 133
Murat Gunduz, Y. Nielsen, M.Caglar Ozdemir (2013)
Quantification of Delay Factors Using the Relative Importance Index Method for Construction Projects in TurkeyJournal of Management in Engineering, 29
J. Ponz-Tienda, E. Pellicer, Javier Benlloch-Marco, C. Andrés-Romano (2015)
The Fuzzy Project Scheduling Problem with Minimal Generalized Precedence RelationsComputer‐Aided Civil and Infrastructure Engineering, 30
Van Luu, Soo-Yong Kim, N. Tuan, S. Ogunlana (2009)
Quantifying schedule risk in construction projects using Bayesian belief networksInternational Journal of Project Management, 27
N. Mansfield, O. Ugwu, T. Doran (1994)
Causes of delay and cost overruns in Nigerian construction projectsInternational Journal of Project Management, 12
S. Kometa, P. Olomolaiye, F. Harris (1994)
Attributes of UK construction clients influencing project consultants' performanceConstruction Management and Economics, 12
Cenk Budayan (2019)
Evaluation of Delay Causes for BOT Projects Based on Perceptions of Different Stakeholders in TurkeyJournal of Management in Engineering
D. Bordoli, A. Baldwin (1998)
A methodology for assessing construction project delaysConstruction Management and Economics, 16
M. Majid, R. Mccaffer (1998)
FACTORS OF NON-EXCUSABLE DELAYS THAT INFLUENCE CONTRACTORS' PERFORMANCEJournal of Management in Engineering, 14
H. Doloi, A. Sawhney, K. Iyer, Sameer Rentala (2012)
Analysing factors affecting delays in Indian construction projectsInternational Journal of Project Management, 30
Murat Gunduz, Y. Nielsen, M.Caglar Ozdemir (2015)
Fuzzy Assessment Model to Estimate the Probability of Delay in Turkish Construction ProjectsJournal of Management in Engineering, 31
Y. Frimpong, J. Oluwoye, L. Crawford (2003)
Causes of delay and cost overruns in construction of groundwater projects in a developing countries; Ghana as a case studyInternational Journal of Project Management, 21
A. Chan, Daniel Chan, John Yeung (2009)
Overview of the application of "fuzzy techniques" in construction management researchJournal of Construction Engineering and Management-asce, 135
Sangwon Han, P. Love, F. Peña-Mora (2013)
A system dynamics model for assessing the impacts of design errors in construction projectsMath. Comput. Model., 57
M. Dlakwa, M. Culpin (1990)
Reasons for overrun in public sector construction projects in NigeriaInternational Journal of Project Management, 8
M. Kumaraswamy, Daniel Chan (1998)
Contributors to construction delaysConstruction Management and Economics, 16
J. Baldwin, James Manthei, H. Rothbart, Robert Harris (1971)
Causes of Delay in the Construction IndustryJournal of the Construction Division, 97
M. Marzouk, Tarek El-Rasas (2013)
Analyzing delay causes in Egyptian construction projectsJournal of Advanced Research, 5
T. Hegazy, Wail Menesi (2008)
Delay Analysis under Multiple Baseline UpdatesJournal of Construction Engineering and Management-asce, 134
A. Kazaz, S. Ulubeyli, Nihan Tuncbilekli (2012)
Causes of delays in construction projects in TurkeyJournal of Civil Engineering and Management, 18
D. Ogunsemi, G. Jagboro (2006)
Time‐cost model for building projects in NigeriaConstruction Management and Economics, 24
Construction delays are a common problem in the Egyptian construction industry. Frequent delays in a project can lead to disputes and litigation. This paper aims to study and analyze the causes of construction delays.Design/methodology/approachThis research identifies delay causes in residential projects in Egypt and analyzes these causes with the relative importance index method. The feedback of construction experts was obtained through interviews. Subsequently, a questionnaire survey was prepared. Fifty-six different delay causes were identified and categorized into eight categories based on a literature review and interviews with 36 experts from the construction industry who represent owners, consultants and contractors.FindingsAccording to the highest values of the relative importance index, the top ten delay causes of residential projects in Egypt are determined. Statistical analysis is carried out using the analysis of variance method to test delay causes obtained from the survey, which revealed a good correlation between residential projects parties with respect to most of the delay causes. A fuzzy logic model using MATLAB is developed for determining the probability of delay of residential projects, and the model was tested in a real case study and was found to be satisfactory.Originality/valueDelay causes in residential projects in Egypt were identified, and these causes were analyzed using the relative importance index method and fuzzy logic.
Journal of Financial Management of Property and Construction – Emerald Publishing
Published: Jul 16, 2020
Keywords: Construction delays; Analysis of variance (ANOVA); Questionnaire survey; Fuzzy logic; Relative importance index
Read and print from thousands of top scholarly journals.
Already have an account? Log in
Bookmark this article. You can see your Bookmarks on your DeepDyve Library.
To save an article, log in first, or sign up for a DeepDyve account if you don’t already have one.
Copy and paste the desired citation format or use the link below to download a file formatted for EndNote
Access the full text.
Sign up today, get DeepDyve free for 14 days.
All DeepDyve websites use cookies to improve your online experience. They were placed on your computer when you launched this website. You can change your cookie settings through your browser.