Fuzzy discrete‐event simulation for modeling uncertain activity duration

Fuzzy discrete‐event simulation for modeling uncertain activity duration Construction‐oriented discrete‐event simulation often faces the problem of defining uncertain information input, such as subjectivity in selecting probability distributions that result from insufficient or lack of site productivity data. This paper proposes incorporation of fuzzy set theory with discrete‐event simulation to handle the vagueness, imprecision and subjectivity in the estimation of activity duration, especially when insufficient or no sample data are available. Based upon an improved activity scanning simulation algorithm, a fuzzy distance ranking measure is adopted in fuzzy simulation time advancement and event selection for simulation experimentation. The uses of the fuzzy activity duration and the probability distribution‐modeled duration are compared through a series of simulation experiments. It is observed that the fuzzy simulation outputs are arrived at through only one cycle of fuzzy discrete‐event simulation, still they contain all the statistical information that are produced through multiple cycles of simulation experiments when the probability distribution approach is adopted. http://www.deepdyve.com/assets/images/DeepDyve-Logo-lg.png Engineering, Construction and Architectural Management Emerald Publishing

Fuzzy discrete‐event simulation for modeling uncertain activity duration

Loading next page...
 
/lp/emerald-publishing/fuzzy-discrete-event-simulation-for-modeling-uncertain-activity-f2xS0ATVXB
Publisher
Emerald Publishing
Copyright
Copyright © 2004 Emerald Group Publishing Limited. All rights reserved.
ISSN
0969-9988
DOI
10.1108/09699980410570184
Publisher site
See Article on Publisher Site

Abstract

Construction‐oriented discrete‐event simulation often faces the problem of defining uncertain information input, such as subjectivity in selecting probability distributions that result from insufficient or lack of site productivity data. This paper proposes incorporation of fuzzy set theory with discrete‐event simulation to handle the vagueness, imprecision and subjectivity in the estimation of activity duration, especially when insufficient or no sample data are available. Based upon an improved activity scanning simulation algorithm, a fuzzy distance ranking measure is adopted in fuzzy simulation time advancement and event selection for simulation experimentation. The uses of the fuzzy activity duration and the probability distribution‐modeled duration are compared through a series of simulation experiments. It is observed that the fuzzy simulation outputs are arrived at through only one cycle of fuzzy discrete‐event simulation, still they contain all the statistical information that are produced through multiple cycles of simulation experiments when the probability distribution approach is adopted.

Journal

Engineering, Construction and Architectural ManagementEmerald Publishing

Published: Dec 1, 2004

Keywords: Construction industry; Fuzzy logic; Simulation