Access the full text.
Sign up today, get DeepDyve free for 14 days.
Gary Biddle, R. Bowen, James Wallace (1998)
Economic value added: some empirical EVAdenceManagerial Finance, 24
Li Liu, Kai Zhu (2007)
Improving Cost Estimates of Construction Projects Using Phased Cost FactorsJournal of Construction Engineering and Management-asce, 133
Ieee Std (2004)
IEEE Guide Adoption of PMI Standard A Guide to the Project Management Body of Knowledge
Abid Haleem, Sushil, Mohammad Qadri, Sanjay Kumar (2012)
Analysis of critical success factors of world-class manufacturing practices: an application of interpretative structural modelling and interpretative ranking processProduction Planning & Control, 23
Munther Abdal-hadi (2010)
Factors Affecting Accuracy of Pre-tender Cost Estimate in Gaza Strip
I. Wuni, G. Shen (2020)
Critical success factors for management of the early stages of prefabricated prefinished volumetric construction project life cycleEngineering, Construction and Architectural Management, 27
Mohamed Morad, S. El-Sayegh (2016)
Use of Earned Value Management in the UAE Construction Industry2016 International Conference on Industrial Engineering, Management Science and Application (ICIMSA)
P. Shrestha, Nirajan Mani (2014)
Impact of Design Cost on Project Performance of Design-Bid-Build Road ProjectsJournal of Management in Engineering, 30
Journal of Construction in Dev Countries, 18
M. Adabre, A. Chan (2018)
The ends required to justify the means for sustainable affordable housing: A review on critical success criteriaSustainable Development
Y. Cheng (2014)
An exploration into cost-influencing factors on construction projectsInternational Journal of Project Management, 32
D. Zimina, G. Ballard, C. Pasquire (2012)
Target value design: using collaboration and a lean approach to reduce construction costConstruction Management and Economics, 30
F. Siddiqui, Abid Haleem, Subhash Wadhwa (2009)
Role of Supply Chain Management in Context of Total Quality Management in Flexible Systems: A State-of the-Art Literature ReviewGlobal Journal of Flexible Systems Management, 10
Sushil (2009)
Interpretive Ranking ProcessGlobal Journal of Flexible Systems Management, 10
S. Agrawal, S. Mehra, P. Siegel (1998)
Cost management system: an operational overviewManagerial Finance, 24
H. Doloi (2013)
Cost Overruns and Failure in Project Management: Understanding the Roles of Key Stakeholders in Construction ProjectsJournal of Construction Engineering and Management-asce, 139
A. Kern, C. Formoso (2006)
A model for integrating cost management and production planning and control in constructionJournal of Financial Management of Property and Construction, 11
D. Ahadzie, D. Proverbs, I. Sarkodie-Poku (2014)
Competencies required of project managers at the design phase of mass house building projectsInternational Journal of Project Management, 32
Y. Olawale, M. Sun (2013)
PCIM: a project control and inhibiting-factors management modelJournal of Management in Engineering, 29
Amr Sourani, M. Sohail (2015)
The Delphi Method: Review and Use in Construction Management ResearchInternational Journal of Construction Education and Research, 11
Y. Olawale, M. Sun (2010)
Cost and time control of construction projects: inhibiting factors and mitigating measures in practiceConstruction Management and Economics, 28
Steven Trost, G. Oberlender (2003)
Predicting Accuracy of Early Cost Estimates using Factor Analysis and Multivariate RegressionJournal of Construction Engineering and Management-asce, 129
Linda Zhang, B. Narkhede, A. Chaple (2017)
Interpretive ranking process-based lean manufacturing barrier evaluation2017 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM)
Project Management Institute (PMI) (2013)
Guide to the project management body of knowledge
B. Waziri (2012)
THE EFFECTS OF CONTROL FACTORS ON THE ACCURACY OF PRETENDER COST ESTIMATING IN NORTH EASTERN NIGERIA
W. Tang, 鄧惠權 (2005)
Cost management for building contractors in Hong Kong
(2011)
Affordable land and housing in Africa
Tobias O.Nyumba, K. Wilson, Christina Derrick, Nibedita Mukherjee (2018)
The use of focus group discussion methodology: Insights from two decades of application in conservationMethods in Ecology and Evolution, 9
Y. Chen, Yangbing Zhang, Jun Liu, Peng Mo (2012)
Interrelationships among Critical Success Factors of Construction Projects Based on the Structural Equation ModelJournal of Management in Engineering, 28
K. Odusami, H. Onukwube (2008)
Factors Affecting the Accuracy of a Pre-Tender Cost Estimate in NigeriaCost engineering, 50
R. Asiedu, Ebenezer Adaku, D. Owusu-Manu (2017)
Beyond the causes: Rethinking mitigating measures to avert cost and time overruns in construction projectsConstruction Innovation: Information, Process, Management, 17
David Mitchell (2012)
5D BIM: CREATING COST CERTAINTY AND BETTER BUILDINGS
H. Johnson, R. Kaplan (1987)
The Rise and Fall of Management AccountingIEEE Engineering Management Review, 15
PV Smith (2016)
Project Cost Management with 5D BIMProcedia - Social and Behavioral Sciences, 226
Y. Kog, P. Loh (2012)
Critical Success Factors for Different Components of Construction ProjectsJournal of Construction Engineering and Management-asce, 138
E. Adinyira, E. Botchway, Titus Kwofie (2012)
Determining Critical Project Success Criteria for Public Housing Building Projects (PHBPS) in GhanaEngineering Management Research, 1
S. Laryea, R. Watermeyer (2016)
Early contractor involvement in framework contracts, 169
Ana Jacomit, A. Granja (2011)
An Investigation into the Adoption of Target Costing on Brazilian Public Social Housing ProjectsArchitectural Engineering and Design Management, 7
M. Iqbal, K. Könings, M. Al-Eraky, M. Alsheikh, J. Merrienboer (2019)
Development of an entrustable professional activities (EPAs) framework for small group facilitators through a participatory design approachMedical Education Online, 25
Ephrem Sinesilassie, K. Tripathi, S. Tabish, K. Jha (2019)
Modeling success factors for public construction projects with the SEM approach: engineer’s perspectiveEngineering, Construction and Architectural Management
L. Obi, M. Arif, D. Kulonda (2017)
Prioritizing cost management system considerations for Nigerian housing projectsJournal of Financial Management of Property and Construction, 22
PV Smith (2014)
Project Cost Management - Global Issues and ChallengesProcedia - Social and Behavioral Sciences, 119
Okoye (2015)
EVALUATION OF MANAGEMENT CHALLENGES FACING CONSTRUCTION PRACTICE IN NIGERIA
Effective cost performance is a crucial criterion measuring successful project management in public-housing projects. This paper aims to analyse the vital underlying factors surrounding the successful cost management process (CMP) outcomes in public housing projects (PHPs).Design/methodology/approachThe research was conducted in three stages. The first stage consisted of a detailed literature review to document success factors affecting cost performances and management. In stage two, brainstorming sessions were undertaken with construction experts knowledgeable in cost management practices and have been involved in PHPs. These sessions were used to refine those success factors for the PHPs settings and define their criticality with respect to the CMP stages using interpretive ranking process. In stage three, focus group sessions were performed to validate the interrelationships of the contextualised critical success factors.FindingsThe top three most critical factors for successful implementation and outcomes at all CMP stages in PHPs settings were found to relate to competencies, team qualities and collaborative practices of the project team. Early contractor involvement and effective construction planning and management also emerged relevant to the process.Practical implicationsGovernment project departments, project managers and construction organisations (consultants and contractors) need to commit and mandate continuous development of cost management competencies for all professionals engaged in PHPs. Channels supporting team integration and collaborative practices between design and construction teams are required to increase the likelihood of successful project cost management practice and outcomes in PHPs.Originality/valueThe research has developed a factor-process relationship model that can be used to improve and evaluate the efficacy of CMP implementation in PHP settings.
Construction Innovation: Information, Process, Management – Emerald Publishing
Published: Oct 21, 2021
Keywords: Process; Project team; Critical success factors; Cost management; Interpretive ranking process; Public-housing project
Read and print from thousands of top scholarly journals.
Already have an account? Log in
Bookmark this article. You can see your Bookmarks on your DeepDyve Library.
To save an article, log in first, or sign up for a DeepDyve account if you don’t already have one.
Copy and paste the desired citation format or use the link below to download a file formatted for EndNote
Access the full text.
Sign up today, get DeepDyve free for 14 days.
All DeepDyve websites use cookies to improve your online experience. They were placed on your computer when you launched this website. You can change your cookie settings through your browser.