Access the full text.
Sign up today, get DeepDyve free for 14 days.
D. Kaplan (2009)
Structural Equation Modeling (2nd ed.): Foundations and Extensions
Antonio Estache, Liam Wren-Lewis (2009)
Toward a Theory of Regulation for Developing Countries: Following Jean-Jacques Laffont's LeadIO: Regulation
J. Laffont, J. Tirole (1993)
A Theory of Incentives in Procurement and Regulation
A. Palma, Guillaume Prunier, L. Leruth (2009)
Towards a Principal-Agent Based Typology of Risks in Public-Private PartnershipsRisk Management
E. Kwofie (2015)
Contribution of unique features of mass housing projects to project team communication performance
Harald Biong (2013)
Journal of Business & Industrial Marketing Emerald Article: Choice of Subcontractor in Markets with Asymmetric Information: Reputation and Price Effects
Bing Li, A. Akintoye, P. Edwards, C. Hardcastle (2005)
Perceptions of positive and negative factors influencing the attractiveness of PPP/PFI procurement for construction projects in the UK: Findings from a questionnaire surveyEngineering, Construction and Architectural Management, 12
Anna Blombäck, B. Axelsson (2007)
The role of corporate brand image in the selection of new subcontractorsJournal of Business & Industrial Marketing, 22
(2010)
The Impact of Asymmetric Information on Communication in Construction Projects
L. Fong, R. Law (2013)
A Primer on Partial Least Squares Structural Equation Modeling (PLS-SEM)European Journal of Tourism Research, 6
J. Guasch, J. Laffont, S. Straub (2008)
Renegotiation of concession contracts in Latin America: Evidence from the water and transport sectorsInternational Journal of Industrial Organization, 26
R. Müller, J. Turner (2005)
The impact of principal–agent relationship and contract type on communication between project owner and managerInternational Journal of Project Management, 23
Eshien Chong, Freddy Huet, Stéphane Saussier, Faye Steiner (2006)
Public-Private Partnerships and Prices: Evidence from Water Distribution in FranceReview of Industrial Organization, 29
J. Turner, R. Müller (2004)
Communication and co-operation on projects between the project owner as principal and the project manager as agentEuropean Management Journal, 22
Subhash Sharma, D. Kleinbaum, L. Kupper (1978)
Applied Regression Analysis and Other Multivariate Methods
(2003)
Principal Components Analysis and Exploratory Factor Analysis in Analyzing Multivariate Data, C.A.: Pacific Grove
Hervé Corvellec, N. Macheridis (2010)
The moral responsibility of project selectorsInternational Journal of Project Management, 28
A Journal of Plant, People and Applied Research Ethnobotany Research and Applications, 1
L. Muthén, B. Muthén (2002)
How to Use a Monte Carlo Study to Decide on Sample Size and Determine PowerStructural Equation Modeling: A Multidisciplinary Journal, 9
Jyh-Bin Yang, Chi-Cheng Yang, Chih-Kuei Kao (2010)
Evaluating schedule delay causes for private participating public construction works under the Build-Operate-Transfer modelInternational Journal of Project Management, 28
A. Field (2005)
Discovering statistics using SPSS, 2nd ed.
A. Field (2000)
Discovering statistics using SPSS for Windows.
(2001)
Using Multivariate Statistics, Allyn and Bacon: Boston
Gao, Si-xia (2008)
Research on the role of attribution in reading comprehension among Chinese EFL learners, 5
C. Bordat, B. McCullouch, K. Sinha, S. Labi (2004)
An Analysis of Cost Overruns and Time Delays of INDOT Projects
C. Yiu, S. Lo, S. Ng, M. Ng (2002)
Contractor selection for small building works in Hong KongStructural Survey, 20
E. Iossa, D. Martimort (2015)
The Simple Microeconomics of Public‐Private PartnershipsJournal of Public Economic Theory, 17
Charles Chiocha (2009)
Corruption and its effects on the development of the construction industry in Malawi
Osei-Kyei Robert, A. Dansoh, K. Kuragu, K. Nkrumah (2014)
Reasons for adopting Public–Private Partnership (PPP) for construction projects in GhanaInternational Journal of Construction Management, 14
ศิวะพร ภู่พันธ์ (2018)
Research Design: Qualitative, Quantitative, and Mixed Methods Approaches, 31
Stefan Wuyts, P. Verhoef, R. Prins (2009)
Partner selection in B2B information service marketsInternational Journal of Research in Marketing, 26
H. El-Gohary (2009)
The impact of e-marketing practices on market performance of small business enterprises : an empirical investigation
E. Iossa, D. Martimort (2008)
The Simple Micro-Economics of Public-Private PartnershipsERPN: Firm Organization (Sub-Topic)
(2009)
Performance of PFI construction. A review by the private finance practice
M. Muhwezi (2009)
Horizontal collaborative purchasing in the Ugandan public sector; an exploratory study
(2007)
An Empirical Study of E-Recruitment Technology Adoption in Malaysia: Assessment of Modified Technology Acceptance Model. Multimedia University, Malaysia
Linda Lobner (2009)
How well do Public-Private Partnerships work?
Mingzhi Lei, R. Lomax (2005)
The Effect of Varying Degrees of Nonnormality in Structural Equation ModelingStructural Equation Modeling: A Multidisciplinary Journal, 12
(2011)
Electronic Marketing Practises in Developing Countries: The Case of Egyptian Business Enterprises, Germany, VDM
Said Boukendour (2007)
Preventing post‐contractual opportunism by an option to switch from one contract to anotherConstruction Management and Economics, 25
(2005)
Social Research, 3rd Ed, Melbourne, Victoria
Joseph Hair, M. Sarstedt, Lucas Hopkins, Volker Kuppelwieser (2014)
Partial least squares structural equation modeling (PLS-SEM): An emerging tool in business researchEuropean Business Review, 26
H. El-Gohary, Z. El-Gohary (2016)
An Attempt to Explore Electronic Marketing Adoption and Implementation Aspects in Developing Countries: The Case of EgyptInternational Journal of Customer Relationship Marketing and Management, 7
S. Lo (1999)
A Fire Safety Assessment System for Existing BuildingsFire Technology, 35
Lukas Furst (2016)
Multivariate Data Analysis With Readings
Journal of Development Economics, 90
G. Winch (2009)
Managing Construction Projects
(2011)
Challenges facing the smooth implementation of Act 663, 2003 of Ghana
J. Laffont, J. Tirole (1986)
Using Cost Observation to Regulate FirmsJournal of Political Economy, 94
J. Tah, Vaughan Carr (2000)
A proposal for construction project risk assessment using fuzzy logicConstruction Management and Economics, 18
Pradeep Ravikumar, M. Veloso (1999)
Latent Variable Models
L. Lobner (2009)
How well do public-private partnerships work?”, Unpublished Masters Thesis Submitted To Wien University
Pui‐wa Lei, Qiong Wu (2007)
Introduction to Structural Equation Modeling: Issues and Practical ConsiderationsEducational Measurement: Issues and Practice, 26
G. Ive, Chen-Yu Chang (2007)
The principle of inconsistent trinity in the selection of procurement systemsConstruction Management and Economics, 25
Martin Schieg (2008)
Strategies for Avoiding Asymmetric Information in Construction Project ManagementJournal of Business Economics and Management, 9
(1993)
SPSS for Windows Professional Statistic Release 6.0, Chicago, IL: SPSS
M. Tongco (2007)
Purposive Sampling as a Tool for Informant SelectionEthnobotany Research and Applications, 5
R. Mcdonald, M. Ho (2002)
Principles and practice in reporting structural equation analyses.Psychological methods, 7 1
S. Tadelis (2002)
Complexity, Flexibility, and the Make-or-Buy DecisionIO: Firm Structure
D. Martimort, S. Straub (2006)
Privatization and Changes in Corruption Patterns: The Roots of Public Discontent
A. Ceric (2003)
A framework for process-driven risk management in construction projects, PhD Thesis
(2008)
Water For The Poor: Corruption in Water Supply and Sanitation
K. Bollen, P. Curran (2007)
Latent Variable Models Under Misspecification Two-Stage Least Squares ( 2 SLS ) and Maximum Likelihood ( ML ) Estimators
Hakan Unsal, J. Taylor (2011)
Modeling Interfirm Dependency: Game Theoretic Simulation to Examine the Holdup Problem in Project NetworksJournal of Construction Engineering and Management-asce, 137
G. Allen (2003)
The private finance initiative
H. El-Gohary (2012)
Factors affecting E-Marketing adoption and implementation in tourism firms: An empirical investigation of Egyptian small tourism organisationsTourism Management, 33
A. Chan, C. Tam (2000)
Factors affecting the quality of building projects in Hong KongInternational Journal of Quality & Reliability Management, 17
(2010)
Ownership Structure in Romanian Listed Companies a Corporate Governance and Corporate Performance Perspective
A. Ouattara (2009)
Effective quality incentives in public procurement : a multi-cases study of experience goods/services
P. Curran, Daniel Bauer, M. Willoughby (2004)
Testing main effects and interactions in latent curve analysis.Psychological methods, 9 2
M. Ahadzi, G. Bowles (2001)
The private finance initiative: The procurement process in perspective
R. Kline (2011)
Principles and practice of structural equation modeling, 3rd ed.
G. Creedy (2006)
Risk factors leading to cost overrun in the delivery of highway construction projects
(2011)
Minimizing Communication Risk in Construction Projects: A Delphi Study of the Key Role of Projects Managers
(2014)
A Conceptual Framework for Evaluating Communication Performance Among Mass Housing Project Team
Riyad Eid, H. El-Gohary (2013)
The impact of E-marketing use on small business enterprises' marketing successThe Service Industries Journal, 33
B. Flyvbjerg, Mette holm, Søren Buhl (2004)
What Causes Cost Overrun in Transport Infrastructure Projects?Transport Reviews, 24
American Economic Review, 92
Aksel Rokkan, A. Buvik (2003)
Inter-firm cooperation and the problem of free riding behavior: an empirical study of voluntary retail chainsJournal of Purchasing and Supply Management, 9
Kam Judgev (2010)
Project management: the managerial processInternational Journal of Managing Projects in Business, 3
B. Flyvbjerg, Mette holm, Søren Buhl (2003)
How common and how large are cost overruns in transport infrastructure projects?Transport Reviews, 23
(2008)
The Principal-Agent—Theory Within the Context of Economic Sciences, Norderstadt, Herstellung Und Verlag, Books on Demand Gmbh
M. Meek, C. Heras-Palou (2007)
Risk management.Hand surgery : an international journal devoted to hand and upper limb surgery and related research : journal of the Asia-Pacific Federation of Societies for Surgery of the Hand, 12 3
The purpose of this paper was to assess the causal relationship(s) between moral hazard and adverse selection of public–private partnership (PPP) construction projects. Structural equation modelling (SEM) was used to explore the cause and effect relationship between moral hazard and adverse selection problems in PPP construction projects in Ghana. The study produced a framework to predict, estimate and depict the complex causal relationships (i.e. the directionality) between moral hazard and adverse selection.Design/methodology/approachTo test the proposed framework, a quantitative methodology was used, in which, data were collected using research questionnaires that targeted a sample of 280 PPP stakeholders in Ghana. In total, 210 useable questionnaires were retrieved, representing a response rate of 75 per cent.FindingsThe interrelationships between the eight causes and the nine effects of moral hazard and adverse selection were established using the model. The tested framework showed the degree of association and isolation of the unobserved variables on the indicator factors. Confirmatory factor analysis (CFA) was used to evaluate the fit of items to latent constructs. Because the fit of each model was good and the item loadings were adequate, it was assumed that the indicators of the different variables factors were fitting. Furthermore, a diagnostic fit analysis was conducted using the robust maximum likelihood method to test the statistical significance of the parameter estimates.Practical implicationsThis novel research is one of the few studies investigating the causal relationships between moral hazard and adverse selection of PPP construction projects. The research concluded with future studies that seek to validate the model developed in other countries and/or other industries.Originality/valueThe research findings will serve as a guide for construction stakeholders in the PPP sector on the causes and effects of adverse selection and moral hazard and how to mitigate these.
Journal of Engineering Design and Technology – Emerald Publishing
Published: Jul 3, 2018
Keywords: Moral hazard; Adverse selection; Structural equation modelling (SEM); Causal relationships; Public–private partnership (PPP)
Read and print from thousands of top scholarly journals.
Already have an account? Log in
Bookmark this article. You can see your Bookmarks on your DeepDyve Library.
To save an article, log in first, or sign up for a DeepDyve account if you don’t already have one.
Copy and paste the desired citation format or use the link below to download a file formatted for EndNote
Access the full text.
Sign up today, get DeepDyve free for 14 days.
All DeepDyve websites use cookies to improve your online experience. They were placed on your computer when you launched this website. You can change your cookie settings through your browser.