Get 20M+ Full-Text Papers For Less Than $1.50/day. Start a 14-Day Trial for You or Your Team.

Learn More →

Causal relationships of moral hazard and adverse selection of Ghanaian Public-Private-Partnership (PPP) construction projects

Causal relationships of moral hazard and adverse selection of Ghanaian Public-Private-Partnership... The purpose of this paper was to assess the causal relationship(s) between moral hazard and adverse selection of public–private partnership (PPP) construction projects. Structural equation modelling (SEM) was used to explore the cause and effect relationship between moral hazard and adverse selection problems in PPP construction projects in Ghana. The study produced a framework to predict, estimate and depict the complex causal relationships (i.e. the directionality) between moral hazard and adverse selection.Design/methodology/approachTo test the proposed framework, a quantitative methodology was used, in which, data were collected using research questionnaires that targeted a sample of 280 PPP stakeholders in Ghana. In total, 210 useable questionnaires were retrieved, representing a response rate of 75 per cent.FindingsThe interrelationships between the eight causes and the nine effects of moral hazard and adverse selection were established using the model. The tested framework showed the degree of association and isolation of the unobserved variables on the indicator factors. Confirmatory factor analysis (CFA) was used to evaluate the fit of items to latent constructs. Because the fit of each model was good and the item loadings were adequate, it was assumed that the indicators of the different variables factors were fitting. Furthermore, a diagnostic fit analysis was conducted using the robust maximum likelihood method to test the statistical significance of the parameter estimates.Practical implicationsThis novel research is one of the few studies investigating the causal relationships between moral hazard and adverse selection of PPP construction projects. The research concluded with future studies that seek to validate the model developed in other countries and/or other industries.Originality/valueThe research findings will serve as a guide for construction stakeholders in the PPP sector on the causes and effects of adverse selection and moral hazard and how to mitigate these. http://www.deepdyve.com/assets/images/DeepDyve-Logo-lg.png Journal of Engineering Design and Technology Emerald Publishing

Causal relationships of moral hazard and adverse selection of Ghanaian Public-Private-Partnership (PPP) construction projects

Loading next page...
 
/lp/emerald-publishing/causal-relationships-of-moral-hazard-and-adverse-selection-of-ghanaian-8y7LlrcV40

References (84)

Publisher
Emerald Publishing
Copyright
© Emerald Publishing Limited
ISSN
1726-0531
DOI
10.1108/jedt-12-2017-0137
Publisher site
See Article on Publisher Site

Abstract

The purpose of this paper was to assess the causal relationship(s) between moral hazard and adverse selection of public–private partnership (PPP) construction projects. Structural equation modelling (SEM) was used to explore the cause and effect relationship between moral hazard and adverse selection problems in PPP construction projects in Ghana. The study produced a framework to predict, estimate and depict the complex causal relationships (i.e. the directionality) between moral hazard and adverse selection.Design/methodology/approachTo test the proposed framework, a quantitative methodology was used, in which, data were collected using research questionnaires that targeted a sample of 280 PPP stakeholders in Ghana. In total, 210 useable questionnaires were retrieved, representing a response rate of 75 per cent.FindingsThe interrelationships between the eight causes and the nine effects of moral hazard and adverse selection were established using the model. The tested framework showed the degree of association and isolation of the unobserved variables on the indicator factors. Confirmatory factor analysis (CFA) was used to evaluate the fit of items to latent constructs. Because the fit of each model was good and the item loadings were adequate, it was assumed that the indicators of the different variables factors were fitting. Furthermore, a diagnostic fit analysis was conducted using the robust maximum likelihood method to test the statistical significance of the parameter estimates.Practical implicationsThis novel research is one of the few studies investigating the causal relationships between moral hazard and adverse selection of PPP construction projects. The research concluded with future studies that seek to validate the model developed in other countries and/or other industries.Originality/valueThe research findings will serve as a guide for construction stakeholders in the PPP sector on the causes and effects of adverse selection and moral hazard and how to mitigate these.

Journal

Journal of Engineering Design and TechnologyEmerald Publishing

Published: Jul 3, 2018

Keywords: Moral hazard; Adverse selection; Structural equation modelling (SEM); Causal relationships; Public–private partnership (PPP)