An approach to find task sequence for re‐balancing of assembly lines Purpose – Cycle time fluctuations in assembly lines are one of the important reasons of re‐balancing. As a result of re‐balancing of assembly lines, it will be necessary to change task sequences or equipment locations. The purpose of this paper is to find the task sequence which enables assembly line balancing (ALB) with minimum number of stations (NS) for different cycle times such that tasks and equipment or fixture locations remain unchanged. Design/methodology/approach – In this paper a heuristic which consist of two stages is proposed to find a common task sequence for different cycle times in assembly lines. Findings – It is shown that optimal NS for different cycle times can be achieved with a fixed task sequence. Research limitations/implications – The approach is limited to a single model case. Model variety together with cycle time variety can be investigated in further studies. Practical implications – Assembly lines which require less time and cost for re‐balancing can be easily designed by the proposed approach. Originality/value – ALB problem is handled with a new viewpoint. Also, it is observed that the proposed approach serves as a bridge between assembly line design and balancing. In this regard, it is thought to have an important place in the ALB literature. http://www.deepdyve.com/assets/images/DeepDyve-Logo-lg.png Assembly Automation Emerald Publishing

An approach to find task sequence for re‐balancing of assembly lines

Assembly Automation , Volume 30 (4): 10 – Sep 28, 2010

Loading next page...
 
/lp/emerald-publishing/an-approach-to-find-task-sequence-for-re-balancing-of-assembly-lines-zzC24dJ409
Publisher
Emerald Publishing
Copyright
Copyright © 2010 Emerald Group Publishing Limited. All rights reserved.
ISSN
0144-5154
DOI
10.1108/01445151011075834
Publisher site
See Article on Publisher Site

Abstract

Purpose – Cycle time fluctuations in assembly lines are one of the important reasons of re‐balancing. As a result of re‐balancing of assembly lines, it will be necessary to change task sequences or equipment locations. The purpose of this paper is to find the task sequence which enables assembly line balancing (ALB) with minimum number of stations (NS) for different cycle times such that tasks and equipment or fixture locations remain unchanged. Design/methodology/approach – In this paper a heuristic which consist of two stages is proposed to find a common task sequence for different cycle times in assembly lines. Findings – It is shown that optimal NS for different cycle times can be achieved with a fixed task sequence. Research limitations/implications – The approach is limited to a single model case. Model variety together with cycle time variety can be investigated in further studies. Practical implications – Assembly lines which require less time and cost for re‐balancing can be easily designed by the proposed approach. Originality/value – ALB problem is handled with a new viewpoint. Also, it is observed that the proposed approach serves as a bridge between assembly line design and balancing. In this regard, it is thought to have an important place in the ALB literature.

Journal

Assembly AutomationEmerald Publishing

Published: Sep 28, 2010

Keywords: Assembly; Production cycle; Balancing