Access the full text.
Sign up today, get DeepDyve free for 14 days.
Electronic Journal of Information Technology in Construction, 17
David-John Gibbs, S. Emmitt, Wayne Lord, K. Ruikar (2015)
BIM and construction contracts – CPC 2013’s approach, 168
C. Eastman, P. Teicholz, R. Sacks, K. Liston (2008)
BIM Handbook: A Guide to Building Information Modeling for Owners, Managers, Designers, Engineers and Contractors
International Journal of Information Systems and Project Management, 3
Mark Winter, Charles Smith, P. Morris, S. Cicmil (2006)
Directions for future research in project management: The main findings of a UK government-funded research networkInternational Journal of Project Management, 24
N. Dawood, V. Vukovic (2015)
Whole Lifecycle Information Flow Underpinned by BIM: Technology, Process, Policy and People
M. Kassem, B. Succar, N. Dawood (2013)
A PROPOSED APPROACH TO COMPARING THE BIM MATURITY OF COUNTRIES
M. Kassem, B. Succar, N. Dawood (2015)
Building Information Modeling: Analyzing Noteworthy Publications of Eight Countries Using a Knowledge Content Taxonomy
H. Omar (2015)
Solutions for the UAE Architecture, Engineering, and Construction (AEC) industry to mandate Building Information Modeling (BIM)
Stephanie Neath, R. Hulse, A. Codd (2014)
Building information modelling in practice: transforming Gatwick airport, UK, 167
Mingying Zeng (2011)
Future of Green BIM Designing and ToolsAdvanced Materials Research, 374-377
B. Succar (2009)
Building information modelling framework: A research and delivery foundation for industry stakeholdersAutomation in Construction, 18
B. Succar, W. Sher, A. Williams (2012)
Measuring BIM performance: Five metricsArchitectural Engineering and Design Management, 8
Sustainable Development of Urban Environment and Building Material, 1-4
Yusuf Arayici, Paul Coates, L. Koskela, M. Kagioglou, C. Usher, K. O’Reilly (2011)
BIM adoption and implementation for architectural practicesStructural Survey, 29
Mian Hafeez, R. Chahrour, V. Vukovic, N. Dawood, M. Kassem (2015)
Investigating the Potential of Delivering Employer Information Requirements in BIM Enabled Construction Projects in Qatar
Kristen Barlish, K. Sullivan (2012)
How To Measure the Benefits of BIM - A Case Study ApproachAutomation in Construction, 24
F. Khosrowshahi, Yusuf Arayici (2012)
Roadmap for implementation of BIM in the UK construction industryEngineering, Construction and Architectural Management, 19
R. Eadie, Tim Mclernon, Adam Patton (2015)
An investigation into the legal issues relating to Building Information Modelling (BIM)
Yusuf Arayici, Timothy Onyenobi, C. Egbu (2012)
Building Information Modelling (BIM) for Facilities Management (FM): The Mediacity Case Study ApproachInt. J. 3 D Inf. Model., 1
Yusuf Arayici, C. Egbu, Paul Coates (2012)
Building information modelling (BIM) implementation and remote construction projects: Issues, Challenges and CritiquesJ. Inf. Technol. Constr., 17
N. Gu, K. London (2010)
Understanding and facilitating BIM adoption in the AEC industryAutomation in Construction, 19
Australasian Journal of Construction Economics and Building, 12
S. Ahmed, Hassan Emam, P. Farrell (2014)
Barriers to BIM/4D Implementation in Qatar
S. Azhar (2011)
Building Information Modeling (BIM): Trends, Benefits, Risks, and Challenges for the AEC IndustryLeadership and Management in Engineering, 11
B. Mcadam (2010)
Building information modelling: the UK legal contextInternational Journal of Law in The Built Environment, 2
Technological and Economic Development of Economy
Jongsung Won, Ghang Lee (2019)
Identifying the consideration factors for successful BIM projects
K. Parvan (2012)
Estimating the impact of Building Information Modeling (BIM) utilization on building project performance
PurposeThe adoption of building information modeling (BIM) technology in the global architecture, engineering and construction (AEC) industries is steadily increasing. However, developing countries such as Saudi Arabia are still lagging behind. The purpose of this paper is to present a framework for BIM adoption in the AEC industry in Saudi Arabia through a case study.Design/methodology/approachThe study adopted a two-pronged approach. First, the various stages, benefits and challenges of BIM implementation in a local AEC firm’s pilot project were documented. Then, a BIM maturity measurement of the pilot project was conducted, and identification of the areas where improvements can be made.FindingsBIM implementation provided several benefits and efficiency gains. These include a faster design processes, effective reuse of information and overall client satisfaction. Challenges faced include a lack of interest by clients and industry stakeholders, inadequate experience of the BIM team, and lack of mentorship from a BIM champion. The findings of the BIM maturity measurement were presented as an implementation framework in the five process areas and ten subject areas of the Project Management Institute’s (PMI) project management framework.Originality/valueThough, frameworks, guidelines and protocols have been developed to facilitate the successful adoption of BIM, the issue is not a case of “one size fits all.” This study thus introduces the much needed awareness in the research and professional domain in Saudi Arabia. It also presents the proposed framework in the PMI framework, which is an incremental innovation to previous work.
International Journal of Managing Projects in Business – Emerald Publishing
Published: Jul 2, 2018
Read and print from thousands of top scholarly journals.
Already have an account? Log in
Bookmark this article. You can see your Bookmarks on your DeepDyve Library.
To save an article, log in first, or sign up for a DeepDyve account if you don’t already have one.
Copy and paste the desired citation format or use the link below to download a file formatted for EndNote
Access the full text.
Sign up today, get DeepDyve free for 14 days.
All DeepDyve websites use cookies to improve your online experience. They were placed on your computer when you launched this website. You can change your cookie settings through your browser.