A model for kitting operations planning

A model for kitting operations planning Purpose – The aim of this paper is to develop a detailed descriptive model for kitting operations, allowing resources sizing and computation of systems’ economic performances. Design/methodology/approach – A mathematical model allows to size resources, given product characteristics and production mix, and determines total system costs by assessing relevant cost items including investment costs (vehicles, containers, storage racks), direct operating costs (transport and kitting workforce, vehicles energy consumption and maintenance, quality costs), indirect operating costs (space requirements, work in process (WIP) and safety stock holding costs, administration and control). Findings – The choice of parts delivery supply to assembly lines requires a thorough economic comparison of alternatives. However, existing models are often simplistic and neglect many critical factors which affect the systems’ performances. As a consequence, industries are unsure about which system is best for their environment. This model allows assessment of the cost and suitability of kitting in any specific industrial setting. Results of the model application are case-specific and cannot be generalized, but the major impact of labour and error correction cost has been highlighted. Research limitations/implications – The model at present focusses on the in-house kitting systems based on travelling kits concept only. Although all quantitative cost drivers are included, some context-related qualitative decision factors are not yet included. The model assumes that the information about product structure and part requirements is known and that a preliminary design of the assembly system (i.e. line balancing) has been carried out. Practical implications – Production managers are given a quantitative decision tool to properly assess the implementation of kitting policies at an early decision stage. This allows exploring the trade-offs between the alternatives and properly planning the adoption of kitting systems, as well as comparing kitting with alternative material supply methods. Originality/value – With respect to previous simplified literature models, this new approach allows quantification of a number of additional factors which are critical for successful implementation of cost-effective kitting systems, including kitting errors. An exhaustive cost estimation of kitting systems in multiple, mixed-model assembly lines is thus permitted. http://www.deepdyve.com/assets/images/DeepDyve-Logo-lg.png Assembly Automation Emerald Publishing

A model for kitting operations planning

Loading next page...
 
/lp/emerald-publishing/a-model-for-kitting-operations-planning-ZRZ0uspoIc
Publisher
Emerald Publishing
Copyright
Copyright © Emerald Group Publishing Limited
ISSN
0144-5154
DOI
10.1108/AA-02-2014-020
Publisher site
See Article on Publisher Site

Abstract

Purpose – The aim of this paper is to develop a detailed descriptive model for kitting operations, allowing resources sizing and computation of systems’ economic performances. Design/methodology/approach – A mathematical model allows to size resources, given product characteristics and production mix, and determines total system costs by assessing relevant cost items including investment costs (vehicles, containers, storage racks), direct operating costs (transport and kitting workforce, vehicles energy consumption and maintenance, quality costs), indirect operating costs (space requirements, work in process (WIP) and safety stock holding costs, administration and control). Findings – The choice of parts delivery supply to assembly lines requires a thorough economic comparison of alternatives. However, existing models are often simplistic and neglect many critical factors which affect the systems’ performances. As a consequence, industries are unsure about which system is best for their environment. This model allows assessment of the cost and suitability of kitting in any specific industrial setting. Results of the model application are case-specific and cannot be generalized, but the major impact of labour and error correction cost has been highlighted. Research limitations/implications – The model at present focusses on the in-house kitting systems based on travelling kits concept only. Although all quantitative cost drivers are included, some context-related qualitative decision factors are not yet included. The model assumes that the information about product structure and part requirements is known and that a preliminary design of the assembly system (i.e. line balancing) has been carried out. Practical implications – Production managers are given a quantitative decision tool to properly assess the implementation of kitting policies at an early decision stage. This allows exploring the trade-offs between the alternatives and properly planning the adoption of kitting systems, as well as comparing kitting with alternative material supply methods. Originality/value – With respect to previous simplified literature models, this new approach allows quantification of a number of additional factors which are critical for successful implementation of cost-effective kitting systems, including kitting errors. An exhaustive cost estimation of kitting systems in multiple, mixed-model assembly lines is thus permitted.

Journal

Assembly AutomationEmerald Publishing

Published: Feb 2, 2015

There are no references for this article.

You’re reading a free preview. Subscribe to read the entire article.


DeepDyve is your
personal research library

It’s your single place to instantly
discover and read the research
that matters to you.

Enjoy affordable access to
over 18 million articles from more than
15,000 peer-reviewed journals.

All for just $49/month

Explore the DeepDyve Library

Search

Query the DeepDyve database, plus search all of PubMed and Google Scholar seamlessly

Organize

Save any article or search result from DeepDyve, PubMed, and Google Scholar... all in one place.

Access

Get unlimited, online access to over 18 million full-text articles from more than 15,000 scientific journals.

Your journals are on DeepDyve

Read from thousands of the leading scholarly journals from SpringerNature, Wiley-Blackwell, Oxford University Press and more.

All the latest content is available, no embargo periods.

See the journals in your area

DeepDyve

Freelancer

DeepDyve

Pro

Price

FREE

$49/month
$360/year

Save searches from
Google Scholar,
PubMed

Create folders to
organize your research

Export folders, citations

Read DeepDyve articles

Abstract access only

Unlimited access to over
18 million full-text articles

Print

20 pages / month

PDF Discount

20% off