Access the full text.
Sign up today, get DeepDyve free for 14 days.
O. Ameh, A. Soyingbe, K. Odusami (2010)
Significant Factors Causing Cost Overruns in Telecommunication Projects in Nigeria, 15
Arshi Faridi, S. El-Sayegh (2006)
Significant factors causing delay in the UAE construction industryConstruction Management and Economics, 24
S. Assaf, Sadiq Al-Hejji (2006)
Causes of delay in large construction projectsInternational Journal of Project Management, 24
Ghaleb Sweis, R. Sweis, Ayman Hammad, A. Shboul (2008)
Delays in construction projects: The case of JordanInternational Journal of Project Management, 26
P. Love, P. Mandal, Hui Li (1999)
Determining the causal structure of rework influences in constructionConstruction Management and Economics, 17
N. Braimah (2013)
Construction Delay Analysis Techniques—A Review of Application Issues and Improvement NeedsBuildings, 3
George Richardson, A. Pugh (1981)
Introduction to System Dynamics Modeling with DYNAMOJournal of the Operational Research Society, 48
I. Mahamid (2011)
Risk matrix for factors affecting time delay in road construction projects: owners' perspectiveEngineering, Construction and Architectural Management, 18
Chia-Li Lin, G. Tzeng (2009)
A value-created system of science (technology) park by using DEMATELExpert Syst. Appl., 36
C. Kaliba, M. Muya, Kanyuka Mumba (2009)
Cost escalation and schedule delays in road construction projects in ZambiaInternational Journal of Project Management, 27
G. Tzeng, Cheng-Hsin Chiang, Chung-Wei Li (2007)
Evaluating intertwined effects in e-learning programs: A novel hybrid MCDM model based on factor analysis and DEMATELExpert Syst. Appl., 32
L. Muhwezi, J. Acai, G. Otim (2014)
An Assessment of the Factors Causing Delays on Building Construction Projects in UgandaInternational Journal of Construction Engineering and Management, 3
J. Shi, S. Cheung, D. Arditi (2001)
Construction Delay Computation MethodJournal of Construction Engineering and Management-asce, 127
Van Luu, Soo-Yong Kim, N. Tuan, S. Ogunlana (2009)
Quantifying schedule risk in construction projects using Bayesian belief networksInternational Journal of Project Management, 27
Y. Olawale, M. Sun (2013)
PCIM: a project control and inhibiting-factors management modelJournal of Management in Engineering, 29
Wei-Chih Wang, Yueh-Hua Lin, Chia-Li Lin, C. Chung, Ming-Tsung Lee (2012)
DEMATEL-based model to improve the performance in a matrix organizationExpert Syst. Appl., 39
H. Alinaitwe, R. Apolot (2013)
Investigation into the Causes of Delays and Cost Overruns in Uganda's Public Sector Construction Projects
H. Wiegand (1968)
Kish, L.: Survey Sampling. John Wiley & Sons, Inc., New York, London 1965, IX + 643 S., 31 Abb., 56 Tab., Preis 83 s.Biometrische Zeitschrift, 10
N. Mansfield, O. Ugwu, T. Doran (1994)
Causes of delay and cost overruns in Nigerian construction projectsInternational Journal of Project Management, 12
Cost Engineering Journal, 42
H. Doloi, A. Sawhney, K. Iyer, Sameer Rentala (2012)
Analysing factors affecting delays in Indian construction projectsInternational Journal of Project Management, 30
J. Sterman (2002)
System Dynamics: Systems Thinking and Modeling for a Complex World
S. Gardezi, I. Manarvi, S. Gardezi (2014)
Time Extension Factors in Construction Industry of PakistanProcedia Engineering, 77
W. Tsai, Jui-Ling Hsu, Chia Chen, Wan-Rung Lin, Shu-Ping Chen (2010)
An integrated approach for selecting corporate social responsibility programs and costs evaluation in the international tourist hotelInternational Journal of Hospitality Management, 29
S. Alkass, M. Mazerolle, F. Harris (1996)
Construction delay analysis techniquesConstruction Management and Economics, 14
Abdullah AlSehaimi, L. Koskela, P. Tzortzopoulos (2013)
Need for Alternative Research Approaches in Construction Management: Case of Delay StudiesJournal of Management in Engineering, 29
A. Vilventhan, S. Kalidindi (2016)
Interrelationships of factors causing delays in the relocation of utilitiesEngineering, Construction and Architectural Management, 23
D. Das (2015)
Development of mechanisms by using conceptual system dynamics models to resolve delay in construction projects
Daniel Chan, M. Kumaraswamy (1997)
A comparative study of causes of time overruns in Hong Kong construction projectsInternational Journal of Project Management, 15
M. Marzouk, Tarek El-Rasas (2013)
Analyzing delay causes in Egyptian construction projectsJournal of Advanced Research, 5
M. Haseeb, Xinhai Lu, Aneesa Bibi, Maloof-ud Dyian, Wahab Rabbani (2012)
PROBLEMS OF PROJECTS AND EFFECTS OF DELAYS IN THE CONSTRUCTION INDUSTRY OF PAKISTANAustralian Journal of Business and Management Research
C. Amoatey, Yaa Ameyaw, Ebenezer Adaku, Samuel Famiyeh (2015)
Analysing delay causes and effects in Ghanaian state housing construction projectsInternational Journal of Managing Projects in Business, 8
A. Kazaz, S. Ulubeyli, Nihan Tuncbilekli (2012)
Causes of delays in construction projects in TurkeyJournal of Civil Engineering and Management, 18
P. Kaming, P. Olomolaiye, G. Holt, F. Harris (1997)
Factors influencing construction time and cost overruns on high-rise projects in IndonesiaConstruction Management and Economics, 15
PurposeThe purpose of this paper is to develop a model for complex interconnected structure of various factors interacting with delay in order to identify the most important factors influencing and influenced by delay based on their interrelations.Design/methodology/approachReviewing literature and interviewing with local experts selected from the Iranian construction industry, top 58 delay factors were identified and categorized into six major groups. The interrelations among these factors were, then, modeled using the system dynamics (SD) approach. The resulting causal loop diagrams obtained from SD were used subsequently for identifying the most significant factors influencing and influenced by delay through the Decision Making Trial and Evaluation Laboratory (DEMATEL) method. The impact of factors on each other was finally determined based on the opinions of 63 experts selected from the Iranian community of consultants, contractors, and clients.FindingsAccording to the analysis, eight out of the 58 factors were identified as the most influencing factors on delay, and nine factors were found to be the most influenced factors by delay in the field of delay analysis. The study also concluded that factors related to labors are the most important and influential factors. In addition, factors related to client were the most influencing factors and external-related factors were the least important ones. At the end, some recommendations to reduce variation of delay in the construction projects are presented as well.Originality/valueConsidering the interconnected structure of the factors, the paper identifies the most important factors interacting with time delay in construction projects.
Engineering Construction & Architectural Management – Emerald Publishing
Published: Jul 17, 2017
Read and print from thousands of top scholarly journals.
Already have an account? Log in
Bookmark this article. You can see your Bookmarks on your DeepDyve Library.
To save an article, log in first, or sign up for a DeepDyve account if you don’t already have one.
Copy and paste the desired citation format or use the link below to download a file formatted for EndNote
Access the full text.
Sign up today, get DeepDyve free for 14 days.
All DeepDyve websites use cookies to improve your online experience. They were placed on your computer when you launched this website. You can change your cookie settings through your browser.