Get 20M+ Full-Text Papers For Less Than $1.50/day. Start a 14-Day Trial for You or Your Team.

Learn More →

A Case Study of Six Sigma R&D Improvement Projects: Design Optimization of Inner Shield Omega CPT

A Case Study of Six Sigma R&D Improvement Projects: Design Optimization of Inner Shield Omega CPT This is an R&D project on design optimization of the inner shield of the Omega colour picture tube at Samsung SDI in Korea. This was an R&D project which basically used the IDOV (Identify, Design, Optimize, Validate) process for Six Sigma implementation. Most Six Sigma projects use the process of DMAIC (Define, Measure, Analyze, Improve, Control). However, this project introduces a new cycle, RDIDOV (Recognize, Define, and IDOV∥. Here CPT means Colour Picture Tube. Samsung SDI is one of the two companies which began Six Sigma in Korea. This case study shows a good exmaple how an R&D Six Sigma project can be usefully employed in manufacturing companies using a new process cycle. http://www.deepdyve.com/assets/images/DeepDyve-Logo-lg.png Asian Journal on Quality Emerald Publishing

A Case Study of Six Sigma R&D Improvement Projects: Design Optimization of Inner Shield Omega CPT

Asian Journal on Quality , Volume 5 (2): 7 – Aug 21, 2004

Loading next page...
 
/lp/emerald-publishing/a-case-study-of-six-sigma-r-d-improvement-projects-design-optimization-m3u4ABydQu

References

References for this paper are not available at this time. We will be adding them shortly, thank you for your patience.

Publisher
Emerald Publishing
Copyright
Copyright © 2004 Emerald Group Publishing Limited. All rights reserved.
ISSN
1598-2688
DOI
10.1108/15982688200400013
Publisher site
See Article on Publisher Site

Abstract

This is an R&D project on design optimization of the inner shield of the Omega colour picture tube at Samsung SDI in Korea. This was an R&D project which basically used the IDOV (Identify, Design, Optimize, Validate) process for Six Sigma implementation. Most Six Sigma projects use the process of DMAIC (Define, Measure, Analyze, Improve, Control). However, this project introduces a new cycle, RDIDOV (Recognize, Define, and IDOV∥. Here CPT means Colour Picture Tube. Samsung SDI is one of the two companies which began Six Sigma in Korea. This case study shows a good exmaple how an R&D Six Sigma project can be usefully employed in manufacturing companies using a new process cycle.

Journal

Asian Journal on QualityEmerald Publishing

Published: Aug 21, 2004

Keywords: Six Sigma; RDIDOV

There are no references for this article.