Techno-economic review of existing and new pumped hydro energy storage plant

Techno-economic review of existing and new pumped hydro energy storage plant There has been a renewed commercial and technical interest in pumped hydro energy storage (PHES) recently with the advent of increased variable renewable energy generation and the development of liberalized electricity markets. During the next 8 years over 7 GW of PHES capacity will be added to the European network while projects are also planned in the USA and Japan. This paper provides a review of existing and proposed PHES plant and discusses the technical and economic drivers for these developments. Current trends for new PHES development generally show that developers operating in liberalized markets are tending to repower, enhance projects or build ‘pump-back’ PHES rather than traditional ‘pure pumped storage’. Capital costs per kW for proposed PHES in the review region range between &z.euro;470/kW and &z.euro;2170/kW, however these costs are highly site and project specific. An emergence has also been observed in recent PHES developments of the use of variable speed technology. This technology, while incurring slightly higher capital costs, offers a greater range of operational flexibility and efficiency over conventional PHES. This paper has primarily been prompted by a lack of detailed information on PHES facilities worldwide and reviews current developments in the context of market and generation mix changes. The most recent large scale review of PHES faculties was undertaken by the American Society of Civil Engineers Hydro Power Task Committee on Pumped Storage in 1996. In the absence of data in the literature on new PHES plant development, this review draws primarily on publicly available information from utilities, government bodies and electricity regulators. In the same context this study is limited to a review region of the European Union, Japan and the United States as information on developments outside these areas is difficult to procure. This paper also gives a review of locations and proposed timelines for new PHES development and provides a thorough up-to-date overview of the development trends of this technology. http://www.deepdyve.com/assets/images/DeepDyve-Logo-lg.png Renewable and Sustainable Energy Reviews Elsevier

Techno-economic review of existing and new pumped hydro energy storage plant

Loading next page...
 
/lp/elsevier/techno-economic-review-of-existing-and-new-pumped-hydro-energy-storage-Sg4gB7cGG7
Publisher
Elsevier
Copyright
Copyright © 2009 Elsevier Ltd
ISSN
1364-0321
D.O.I.
10.1016/j.rser.2009.11.015
Publisher site
See Article on Publisher Site

Abstract

There has been a renewed commercial and technical interest in pumped hydro energy storage (PHES) recently with the advent of increased variable renewable energy generation and the development of liberalized electricity markets. During the next 8 years over 7 GW of PHES capacity will be added to the European network while projects are also planned in the USA and Japan. This paper provides a review of existing and proposed PHES plant and discusses the technical and economic drivers for these developments. Current trends for new PHES development generally show that developers operating in liberalized markets are tending to repower, enhance projects or build ‘pump-back’ PHES rather than traditional ‘pure pumped storage’. Capital costs per kW for proposed PHES in the review region range between &z.euro;470/kW and &z.euro;2170/kW, however these costs are highly site and project specific. An emergence has also been observed in recent PHES developments of the use of variable speed technology. This technology, while incurring slightly higher capital costs, offers a greater range of operational flexibility and efficiency over conventional PHES. This paper has primarily been prompted by a lack of detailed information on PHES facilities worldwide and reviews current developments in the context of market and generation mix changes. The most recent large scale review of PHES faculties was undertaken by the American Society of Civil Engineers Hydro Power Task Committee on Pumped Storage in 1996. In the absence of data in the literature on new PHES plant development, this review draws primarily on publicly available information from utilities, government bodies and electricity regulators. In the same context this study is limited to a review region of the European Union, Japan and the United States as information on developments outside these areas is difficult to procure. This paper also gives a review of locations and proposed timelines for new PHES development and provides a thorough up-to-date overview of the development trends of this technology.

Journal

Renewable and Sustainable Energy ReviewsElsevier

Published: May 1, 2010

References

  • Capturing grid power
    Roberts B

You’re reading a free preview. Subscribe to read the entire article.


DeepDyve is your
personal research library

It’s your single place to instantly
discover and read the research
that matters to you.

Enjoy affordable access to
over 18 million articles from more than
15,000 peer-reviewed journals.

All for just $49/month

Explore the DeepDyve Library

Search

Query the DeepDyve database, plus search all of PubMed and Google Scholar seamlessly

Organize

Save any article or search result from DeepDyve, PubMed, and Google Scholar... all in one place.

Access

Get unlimited, online access to over 18 million full-text articles from more than 15,000 scientific journals.

Your journals are on DeepDyve

Read from thousands of the leading scholarly journals from SpringerNature, Elsevier, Wiley-Blackwell, Oxford University Press and more.

All the latest content is available, no embargo periods.

See the journals in your area

DeepDyve

Freelancer

DeepDyve

Pro

Price

FREE

$49/month
$360/year

Save searches from
Google Scholar,
PubMed

Create lists to
organize your research

Export lists, citations

Read DeepDyve articles

Abstract access only

Unlimited access to over
18 million full-text articles

Print

20 pages / month

PDF Discount

20% off