Designing out construction waste using BIM technology: Stakeholders' expectations for industry deployment

Designing out construction waste using BIM technology: Stakeholders' expectations for industry... The need to use Building Information Modelling (BIM) for Construction and Demolition Waste (CDW) minimisation is well documented but most of the existing CDW management tools still lack BIM functionality. This study therefore assesses the expectations of stakeholders on how BIM could be employed for CDW management. After a review of extant literature to assess the limitations of existing CDW management tools, qualitative Focus Group Interviews (FGIs) were conducted with professionals who are familiar with the use of BIM to understand their expectations on the use of BIM for CDW management. The 22 factors identified from the qualitative data analyses were then developed into a questionnaire survey. The exploratory factor analysis of the responses reveals five major groups of BIM expectations for CDW management, which are: (i) BIM-based collaboration for waste management, (ii) waste-driven design process and solutions, (iii) waste analysis throughout building lifecycle, (iv) innovative technologies for waste intelligence and analytics, and (v) improved documentation for waste management. Considering these groups of factors is key to meeting the needs of the stakeholders regarding the use of BIM for CDW management. These groups of factors are important considerations for the implementation and acceptance of BIM-based tools and practices for CDW management within the construction industry. http://www.deepdyve.com/assets/images/DeepDyve-Logo-lg.png Journal of Cleaner Production Elsevier

Designing out construction waste using BIM technology: Stakeholders' expectations for industry deployment

Loading next page...
 
/lp/elsevier/designing-out-construction-waste-using-bim-technology-stakeholders-my1PqEwyMe
Publisher
Elsevier
Copyright
Copyright © 2018 The Authors
ISSN
0959-6526
D.O.I.
10.1016/j.jclepro.2018.01.022
Publisher site
See Article on Publisher Site

Abstract

The need to use Building Information Modelling (BIM) for Construction and Demolition Waste (CDW) minimisation is well documented but most of the existing CDW management tools still lack BIM functionality. This study therefore assesses the expectations of stakeholders on how BIM could be employed for CDW management. After a review of extant literature to assess the limitations of existing CDW management tools, qualitative Focus Group Interviews (FGIs) were conducted with professionals who are familiar with the use of BIM to understand their expectations on the use of BIM for CDW management. The 22 factors identified from the qualitative data analyses were then developed into a questionnaire survey. The exploratory factor analysis of the responses reveals five major groups of BIM expectations for CDW management, which are: (i) BIM-based collaboration for waste management, (ii) waste-driven design process and solutions, (iii) waste analysis throughout building lifecycle, (iv) innovative technologies for waste intelligence and analytics, and (v) improved documentation for waste management. Considering these groups of factors is key to meeting the needs of the stakeholders regarding the use of BIM for CDW management. These groups of factors are important considerations for the implementation and acceptance of BIM-based tools and practices for CDW management within the construction industry.

Journal

Journal of Cleaner ProductionElsevier

Published: Apr 10, 2018

References

You’re reading a free preview. Subscribe to read the entire article.


DeepDyve is your
personal research library

It’s your single place to instantly
discover and read the research
that matters to you.

Enjoy affordable access to
over 12 million articles from more than
10,000 peer-reviewed journals.

All for just $49/month

Explore the DeepDyve Library

Unlimited reading

Read as many articles as you need. Full articles with original layout, charts and figures. Read online, from anywhere.

Stay up to date

Keep up with your field with Personalized Recommendations and Follow Journals to get automatic updates.

Organize your research

It’s easy to organize your research with our built-in tools.

Your journals are on DeepDyve

Read from thousands of the leading scholarly journals from SpringerNature, Elsevier, Wiley-Blackwell, Oxford University Press and more.

All the latest content is available, no embargo periods.

See the journals in your area

Monthly Plan

  • Read unlimited articles
  • Personalized recommendations
  • No expiration
  • Print 20 pages per month
  • 20% off on PDF purchases
  • Organize your research
  • Get updates on your journals and topic searches

$49/month

Start Free Trial

14-day Free Trial

Best Deal — 39% off

Annual Plan

  • All the features of the Professional Plan, but for 39% off!
  • Billed annually
  • No expiration
  • For the normal price of 10 articles elsewhere, you get one full year of unlimited access to articles.

$588

$360/year

billed annually
Start Free Trial

14-day Free Trial