Access the full text.
Sign up today, get DeepDyve free for 14 days.
Chen-Fu Chien, Yun-Ju Chen, Jin-Tang Peng (2010)
Manufacturing intelligence for semiconductor demand forecast based on technology diffusion and product life cycleInternational Journal of Production Economics, 128
J. Fowler, Sungmin Park, G. Mackulak, D. Shunk (2001)
Efficient cycle time-throughput curve generation using a fixed sample size procedureInternational Journal of Production Research, 39
Chen-Fu Chien, Chien-Hung Chen (2007)
Using genetic algorithms (GA) and a coloured timed Petri net (CTPN) for modelling the optimization-based schedule generator of a generic production scheduling systemInternational Journal of Production Research, 45
R. Atherton, J. Dayhoff (1986)
Signature Analysis: Simulation of Inventory, Cycle Time, and Throughput Trade-Offs in Wafer FabricationIEEE Transactions on Components, Hybrids, and Manufacturing Technology, 9
R. Dabbas, Hung-Nan Chen (2001)
Mining semiconductor manufacturing data for productivity improvement - an integrated relational database approachComput. Ind., 45
J. Fowler, S. Brown, H. Gold, A. Schoeming (1997)
Measurable improvements in cycle-time-constrained capacity1997 IEEE International Symposium on Semiconductor Manufacturing Conference Proceedings (Cat. No.97CH36023)
(1996)
Using queuing curve approximation in a fab to determine productivity improvement
Chen-Fu Chien, A. Hsiao, Ivan Wang (2004)
CONSTRUCTING SEMICONDUCTOR MANUFACTURING PERFORMANCE INDEXES AND APPLYING DATA MINING FOR MANUFACTURING DATA ANALYSISJournal of the Chinese Institute of Industrial Engineers, 21
R. Leachman, Jeenyoung Kang, Vincent Lin (2002)
Special Issue: Franz Edelman Award for Achievement in Operations Research and the Management Sciences: SLIM: Short Cycle Time and Low Inventory in Manufacturing at Samsung ElectronicsInterfaces, 32
G. Moore (1998)
Cramming More Components Onto Integrated CircuitsProceedings of the IEEE, 86
J. Morrison, D. Martin (2007)
Practical Extensions to Cycle Time Approximations for the $G/G/m$-Queue With ApplicationsIEEE Transactions on Automation Science and Engineering, 4
Mathieu Fortin (2019)
Nonlinear RegressionHandbook of Regression Analysis With Applications in R
C. Kuo, Chen-Fu Chien, Jan-Daw Chen (2011)
Manufacturing Intelligence to Exploit the Value of Production and Tool Data to Reduce Cycle TimeIEEE Transactions on Automation Science and Engineering, 8
J. Miltenburg, D. Sparling (1996)
Managing and reducing total cycle time: models and analysisInternational Journal of Production Economics
H. Papadopoulos, M. Vidalis (2001)
Minimizing WIP inventory in reliable production linesInternational Journal of Production Economics, 70
Kuldeep Kumar, M. Alsaleh (1996)
A comparative study for the estimation of parameters in nonlinear modelsApplied Mathematics and Computation, 77
R. C. Leachman, J. Kang, V. Lin (2002)
SLIM: Short cycle time and low inventory in manufacturing at samsung electronicsInterfaces, 32
Chih-Yuan Yu, Han-Pang Huang (2002)
On-line learning delivery decision support system for highly product mixed semiconductor foundryIEEE Transactions on Semiconductor Manufacturing, 15
Hong Chen, J. Harrison, A. Mandelbaum, A. Ackere, L. Wein (1988)
Empirical Evaluation of a Queueing Network Model for Semiconductor Wafer FabricationOper. Res., 36
Semiconductor manufacturing is one of the most complicated production processes with the challenges of dynamic job arrival, job re-circulation, shifting bottlenecks, and lengthy fabrication process. Owing to the lengthy wafer fabrication process, work in process (WIP) usually affects the cycle time and throughput in the semiconductor fabrication. As the applications of semiconductor have reached the era of consumer electronics, time to market has played an increasingly critical role in maintaining a competitive advantage for a semiconductor company. Many past studies have explored how to reduce the time of scheduling and dispatching in the production cycle. Focusing on real settings, this study aims to develop a manufacturing intelligence approach by integrating Gauss-Newton regression method and back-propagation neural network as basic model to forecast the cycle time of the production line, where WIP, capacity, utilization, average layers, and throughput are rendered as input factors for indentifying effective rules to control the levels of the corresponding factors as well as reduce the cycle time. Additionally, it develops an adaptive model for rapid response to change of production line status. To evaluate the validity of this approach, we conducted an empirical study on the demand change and production dynamics in a semiconductor foundry in Hsinchu Science Park. The approach proved to be successful in improving forecast accuracy and realigning the desired levels of throughput in production lines to reduce the cycle time.
Journal of Intelligent Manufacturing – Springer Journals
Published: Jul 23, 2011
Read and print from thousands of top scholarly journals.
Already have an account? Log in
Bookmark this article. You can see your Bookmarks on your DeepDyve Library.
To save an article, log in first, or sign up for a DeepDyve account if you don’t already have one.
Copy and paste the desired citation format or use the link below to download a file formatted for EndNote
Access the full text.
Sign up today, get DeepDyve free for 14 days.
All DeepDyve websites use cookies to improve your online experience. They were placed on your computer when you launched this website. You can change your cookie settings through your browser.