TY - JOUR AB - This is the continuation of the feature on the VAK 191B. Articles on the construction, landing gear, aerodynamic design, the power plant, advanced powered Hying controls, the hydraulic components and the electrical generating system appeared in the July issue. TI - Fuel bladder tanks JF - Aircraft Engineering and Aerospace Technology DO - 10.1108/eb035063 DA - 1973-08-01 UR - https://www.deepdyve.com/lp/emerald-publishing/fuel-bladder-tanks-so8WjBUeWx SP - 17 EP - 17 VL - 45 IS - 8 DP - DeepDyve ER -