TY - JOUR AU - Osadchii, A. AB - There is a basic possibility to raise the maximum power of a unit containing the VVÉR-1000 reactor in the course of the fuel charge burn-up and with lowering the coefficient of the energy-release nonuniformity in the reactor core. It is more advantageous economically to obtain additional power in carrying the peak load. With the duration of such operating conditions for 1000–2000 h/yr savings can amounts to 1–4 million rubles per year per 100 MW of additional power when compared to peaking GTP. TI - Efficiency of producing additional power in units of nuclear power stations containing water-cooled-water-moderated reactors JO - Atomic Energy DO - 10.1007/BF01127261 DA - 2005-01-24 UR - https://www.deepdyve.com/lp/springer-journals/efficiency-of-producing-additional-power-in-units-of-nuclear-power-MNtiNcUGfb SP - 975 EP - 980 VL - 61 IS - 6 DP - DeepDyve ER -