TY - JOUR AU - Ahmad, A AB - This article presents failure investigation on a high-strength alloy SA213-T91 super-heater tube. This failure is the first occurrence involving the material in Kapar Power Station Malaysia. The investigation includes visual inspections, hardness measurements, and microscopic examinations. The failed super-heater tube shows a wide open rupture with thin and blunt edges. Hardness readings on all the as-received tubes are used for estimating the operating metal temperature of the super-heater tubes. Microstructures of the failed tube show numerous creep cavities consisting of individual pores and chain of pores which form micro- and macro-cracks. The findings confirmed that the super-heater tube is failed by short-term overheating. Higher temperatures of the flue gas due to the inconsistent feeding of pulverized fuels into the burner is identified to cause overheating of the failed tube. TI - Failure Evaluation on a High-Strength Alloy SA213-T91 Super Heater Tube of a Power Generation JF - Proceedings of the Institution of Mechanical Engineers, Part E: Journal of Process Mechanical Engineering DO - 10.1243/09544089JPME332 DA - 2010-11-01 UR - https://www.deepdyve.com/lp/sage/failure-evaluation-on-a-high-strength-alloy-sa213-t91-super-heater-JanD60MCwB SP - 269 EP - 273 VL - 224 IS - 4 DP - DeepDyve ER -