TY - JOUR AU - AB - MATEC Web of Conferences 248, 03013 (2018) https://doi.org/10.1051/matecconf /201824803013 ESTIC 2018 Implementation of Risk Management in Manufacturing of Wellhead and Christmas Tree Equipment (Risk management framework) 1, 2, * 1 2 3 Abdul Hamid , Ishak Bin Baba , Sulaiman Bin Haji Hasan , Agung Setyo Darmawan and Nushatisah Faculty Technology Engineering Universiti Tun Hussein Onn Malaysia, 86400 Johor, Malaysia Faculty Engineering, Mechanical Engineering Department, Universitas Batam, 29464 Indonesia Department of Mechanical Engineering, Faculty of Engineering, Universitas Muhammadiyah Surakarta, Jl. Ahmad Yani, Tromol Pos 1 Pabelan, Surakarta 57162, Indonesia Abstract. Wellheads and Christmas trees are the main equipment for oil production. They are manufactured in the plant and installed on the casing head to seal the annular space between casing and tubing. They are used to transport oil to pipeline in well field. The loss of wellhead and Christmas tree integrity can result in major accidents, presenting a severe risk to the environment. Therefor a purpose of this study is to investigate of an organization perception for risk management implementation in manufacturing wellhead and Christmas tree equipment . The responses were analysed using SPSS software by using Cronbach’s α, mean-value and standard deviation. Data was collected by posting a TI - Implementation of Risk Management in Manufacturing of Wellhead and Christmas Tree Equipment (Risk management framework) JO - MATEC Web of Conferences DO - 10.1051/matecconf/201824803013 DA - 2018-01-01 UR - https://www.deepdyve.com/lp/unpaywall/implementation-of-risk-management-in-manufacturing-of-wellhead-and-7ix6jb5feV DP - DeepDyve ER -