Get 20M+ Full-Text Papers For Less Than $1.50/day. Start a 14-Day Trial for You or Your Team.

Learn More →

A Mobile Test Plant for Turbojet Engines

A Mobile Test Plant for Turbojet Engines THE large and elaborate installations needed for the testing of gas turbine power plants have become familiar, together with the bulky equipment needed to reduce the noise to a tolerable level. It was therefore interesting to see at Farnborough last September a complete test plant for jet engines of up to 12,500 lb. thrust arranged to be towed on the road. This is possible because the pure jet provides its own means of absorbing its power, and because the requirement for this particular plant was that it could be used by operators or the services on advanced operational airfields, or in other temporary or semipermanent situations, where the noise can be accepted. http://www.deepdyve.com/assets/images/DeepDyve-Logo-lg.png Aircraft Engineering and Aerospace Technology Emerald Publishing

A Mobile Test Plant for Turbojet Engines

Aircraft Engineering and Aerospace Technology , Volume 26 (1): 2 – Jan 1, 1954

Loading next page...
 
/lp/emerald-publishing/a-mobile-test-plant-for-turbojet-engines-Snxu14ABll

References

References for this paper are not available at this time. We will be adding them shortly, thank you for your patience.

Publisher
Emerald Publishing
Copyright
Copyright © Emerald Group Publishing Limited
ISSN
0002-2667
DOI
10.1108/eb032382
Publisher site
See Article on Publisher Site

Abstract

THE large and elaborate installations needed for the testing of gas turbine power plants have become familiar, together with the bulky equipment needed to reduce the noise to a tolerable level. It was therefore interesting to see at Farnborough last September a complete test plant for jet engines of up to 12,500 lb. thrust arranged to be towed on the road. This is possible because the pure jet provides its own means of absorbing its power, and because the requirement for this particular plant was that it could be used by operators or the services on advanced operational airfields, or in other temporary or semipermanent situations, where the noise can be accepted.

Journal

Aircraft Engineering and Aerospace TechnologyEmerald Publishing

Published: Jan 1, 1954

There are no references for this article.