Identification of optimal size resources for a repetitive housing construction

Identification of optimal size resources for a repetitive housing construction Deployment of optimal size of resources is a key issue in repetitive construction projects. This paper describes a simulation model based on queuing theory for the resource scheduling of a real repetitive housing project involving 320 dwelling units constructed in East Delhi, India. The optimal size of resources, defined as the minimum size required to keep the project duration a minimum, has been identified from the results of a series of sensitivity analyses in which the size of the resources was varied one at a time. The duration of the project, the period of utilization of the resources, and the queue length of activities waiting for service are also reported in this paper. It has been shown that reduction in size of resources is achievable without increasing the duration of the project and queue length of activities. Increase in the size of some specialised crews is also proved advantageous. http://www.deepdyve.com/assets/images/DeepDyve-Logo-lg.png Engineering Construction & Architectural Management Emerald Publishing

Identification of optimal size resources for a repetitive housing construction

Loading next page...
 
/lp/emerald-publishing/identification-of-optimal-size-resources-for-a-repetitive-housing-hmAtavaZGy

References (11)

Publisher
Emerald Publishing
Copyright
Copyright © Emerald Group Publishing Limited
ISSN
0969-9988
DOI
10.1108/eb021158
Publisher site
See Article on Publisher Site

Abstract

Deployment of optimal size of resources is a key issue in repetitive construction projects. This paper describes a simulation model based on queuing theory for the resource scheduling of a real repetitive housing project involving 320 dwelling units constructed in East Delhi, India. The optimal size of resources, defined as the minimum size required to keep the project duration a minimum, has been identified from the results of a series of sensitivity analyses in which the size of the resources was varied one at a time. The duration of the project, the period of utilization of the resources, and the queue length of activities waiting for service are also reported in this paper. It has been shown that reduction in size of resources is achievable without increasing the duration of the project and queue length of activities. Increase in the size of some specialised crews is also proved advantageous.

Journal

Engineering Construction & Architectural ManagementEmerald Publishing

Published: Apr 1, 2000

There are no references for this article.