Get 20M+ Full-Text Papers For Less Than $1.50/day. Start a 14-Day Trial for You or Your Team.

Learn More →

NEWS OF INDUSTRY

NEWS OF INDUSTRY Effluent Pipe Protection. A mile of 18in.diam. steel pipe was recently pulled into the Usk estuary to form the new pipeline for treated effluent from the Newport factory of Monsanto Chemicals Ltd. It replaces a castiron outfall which was not large enough to handle the anticipated increase in the amount of treated effluent. The path of the new pipe runs from the shore near Goldcliffe to the discharge position 5,000 ft. out in the Channel to a point below the lowest predicted tide level. http://www.deepdyve.com/assets/images/DeepDyve-Logo-lg.png Anti-Corrosion Methods and Materials Emerald Publishing

Loading next page...
 
/lp/emerald-publishing/news-of-industry-lSd8pwn2bC

References

References for this paper are not available at this time. We will be adding them shortly, thank you for your patience.

Publisher
Emerald Publishing
Copyright
Copyright © Emerald Group Publishing Limited
ISSN
0003-5599
DOI
10.1108/eb019746
Publisher site
See Article on Publisher Site

Abstract

Effluent Pipe Protection. A mile of 18in.diam. steel pipe was recently pulled into the Usk estuary to form the new pipeline for treated effluent from the Newport factory of Monsanto Chemicals Ltd. It replaces a castiron outfall which was not large enough to handle the anticipated increase in the amount of treated effluent. The path of the new pipe runs from the shore near Goldcliffe to the discharge position 5,000 ft. out in the Channel to a point below the lowest predicted tide level.

Journal

Anti-Corrosion Methods and MaterialsEmerald Publishing

Published: Jul 1, 1960

There are no references for this article.