Access the full text.
Sign up today, get DeepDyve free for 14 days.
Hai Tan, C. Anumba (2013)
Web-based Construction Claims Management System: Operation of the Prototype
Zhiliang Ma, Shiyao Cai, Na Mao, Qiliang Yang, Junguo Feng, Pengyi Wang (2018)
Construction quality management based on a collaborative system using BIM and indoor positioningAutomation in Construction
A. Ghaffarianhoseini, J. Tookey, Amirhosein Ghaffarianhoseini, N. Naismith, S. Azhar, Olia Efimova, K. Raahemifar (2017)
Building Information Modelling (BIM) uptake: Clear benefits, understanding its implementation, risks and challengesRenewable & Sustainable Energy Reviews, 75
H. Chou, Jyh-Bin Yang (2017)
Preliminary Evaluation of BIM-based Approaches for Schedule Delay AnalysisIOP Conference Series: Materials Science and Engineering, 245
Oh-Seong Kwon, Chansik Park, C. Lim (2014)
A defect management system for reinforced concrete work utilizing BIM, image-matching and augmented realityAutomation in Construction, 46
Zahra Jalali, E. Noorzai, S. Heidari (2020)
Design and optimization of form and facade of an office building using the genetic algorithmScience and Technology for the Built Environment, 26
Bhargav Dave, A. Buda, Antti Nurminen, Kary Främling (2018)
A framework for integrating BIM and IoT through open standardsAutomation in Construction
Pardis Pishdad-Bozorgi, J. Garza, W. Blvd (2012)
Comparative Analysis of Design-Bid-Build and Design-Build From the Standpoint of Claims
Nancy Greenwald (2013)
A Creative Proposal for Dispute Systems Design for Construction Projects Employing BIMJournal of Legal Affairs and Dispute Resolution in Engineering and Construction, 5
David-John Gibbs, S. Emmitt, K. Ruikar, Wayne Lord (2013)
An Investigation into whether Building Information Modelling (BIM) can Assist with Construction Delay ClaimsInt. J. 3 D Inf. Model., 2
Li Wang, Fernanda Leite (2013)
Knowledge Discovery of Spatial Conflict Resolution Philosophies in BIM-Enabled MEP Design Coordination Using Data Mining Techniques: A Proof-of-ConceptComputing in Civil Engineering
H. Moon, N. Dawood, Leen-Seok Kang (2014)
Development of workspace conflict visualization system using 4D object of work scheduleAdv. Eng. Informatics, 28
M. Abdul-Malak, T. Abdulhai (2017)
Conceptualization of the Contractor’s Project Management Group Dynamics in Claims Initiation and Documentation EvolutionJournal of Legal Affairs and Dispute Resolution in Engineering and Construction, 9
Aref Charehzehi, C. Chai, Aminah Yusof, H. Chong, S. Loo (2017)
Building information modeling in construction conflict managementInternational Journal of Engineering Business Management, 9
E. Noorzai (2020)
Performance Analysis of Alternative Contracting Methods for Highway Construction Projects: Case Study for IranJournal of Infrastructure Systems, 26
Majid Jalal, E. Noorzai, Tayebe Roushan (2019)
Root Cause Analysis of the Most Frequent Claims in the Building Industry through the SCoP 3 E Ishikawa DiagramJournal of Legal Affairs and Dispute Resolution in Engineering and Construction
E. Noorzai, M. Golabchi (2020)
Selecting a proper construction system in small and medium mass housing projects, considering success criteria and construction volume and heightJournal of Engineering, Design and Technology, 18
Sijie Zhang, Frank Boukamp, J. Teizer (2015)
Ontology-based semantic modeling of construction safety knowledge: Towards automated safety planning for job hazard analysis (JHA)Automation in Construction, 52
Sijie Zhang, Kristiina Sulankivi, M. Kiviniemi, I. Romo, C. Eastman, J. Teizer (2015)
BIM-based fall hazard identification and prevention in construction safety planningSafety Science, 72
V. Shahhosseini, Hossein Hajarolasvadi (2018)
A conceptual framework for developing a BIM-enabled claim management systemInternational Journal of Construction Management, 21
M. Arshad, Muhammad Thaheem, Abdur Nasir, Muhammad Malik (2019)
Contractual Risks of Building Information Modeling: Toward a Standardized Legal Framework for Design-Bid-Build ProjectsJournal of Construction Engineering and Management
D. Parikh, G. Joshi, D. Patel (2019)
Development of Prediction Models for Claim Cause Analyses in Highway ProjectsJournal of Legal Affairs and Dispute Resolution in Engineering and Construction
Chansik Park, Do-Yeop Lee, Oh-Seong Kwon, Xiangyu Wang (2013)
A framework for proactive construction defect management using BIM, augmented reality and ontology-based data collection templateAutomation in Construction, 33
Hyun Lee, Hyun-Kyung Oh, Young-Chul Kim, Kunhee Choi (2015)
Quantitative analysis of warnings in building information modeling (BIM)Automation in Construction, 51
P. Demian, D. Walters (2014)
The advantages of information management through building information modellingConstruction Management and Economics, 32
Jianping Zhang, Zhen-Zhong Hu (2011)
BIM- and 4D-based integrated solution of analysis and management for conflicts and structural safety problems during construction: 1. Principles and methodologiesAutomation in Construction, 20
Jan-Peter Ferdinand, Uli Meyer (2017)
The social dynamics of heterogeneous innovation ecosystemsInternational Journal of Engineering Business Management, 9
M. Marzouk, A. Othman, M. Enaba, Mohamed Zaher (2018)
Using BIM to Identify Claims Early in the Construction Industry: Case StudyJournal of Legal Affairs and Dispute Resolution in Engineering and Construction
Katayoon Taghizade, A. Heidari, E. Noorzai (2019)
Environmental Impact Profiles for Glazing Systems: Strategies for Early Design ProcessJournal of Architectural Engineering
Ramsha Akram, Muhammad Thaheem, Abdur Nasir, T. Ali, Shamraiza Khan (2019)
Exploring the role of building information modeling in construction safety through science mappingSafety Science, 120
B. Giel, R. Issa, Rui Liu, Le Zhang (2013)
A Tool for Automatically Tracking Object Changes in BIM to Assist Construction Managers in Coordinating and Managing Trades
Zhen-Zhong Hu, Jianping Zhang (2011)
BIM- and 4D-based integrated solution of analysis and management for conflicts and structural safety problems during construction: 2. Development and site trialsAutomation in Construction, 20
E. Noorzai, Kobra Jafari, Rouhallah Heshmatnezhad, B. Vahedi (2016)
Implementing AHP Approach to Select an Appropriate Financing Method for PPP Highway Projects in Iran
S. Hasheminasab, M. Mortaheb, A. F (2014)
Causes of common and frequent claims in oil, gas and petrochemical projects of IranKSCE Journal of Civil Engineering, 18
R. Jin, C. Hancock, L. Tang, D. Wanatowski (2017)
Investigation of BIM Investment, Returns, and Risks in China's AEC Industries
Lijuan Chen, Hanbin Luo (2014)
A BIM-based construction quality management model and its applicationsAutomation in Construction, 46
Michel Guévremont, A. Hammad (2018)
Visualization of Delay Claim Analysis Using 4D SimulationJournal of Legal Affairs and Dispute Resolution in Engineering and Construction
H. Fan, Fan Xue, Heng Li (2015)
Project-based as-needed information retrieval from unstructured AEC documentsJournal of Management in Engineering, 31
A. Chehayeb, M. Al-Hussein (2005)
Canadian Construction Claim Tracker: An Integrated Repository System for Canadian Case-Law Construction Claims
This study aims at introducing a claim management model based on building information modeling (BIM) for claims that can be visualized in BIM models.Design/methodology/approachBased on the results of a questionnaire survey, 10 claims were identified as claims that can be visualized in BIM models (named hard claims in this study). Then, a BIM-based claim management model was developed and used in a case study.FindingsA BIM-based claim management model is represented. The claim management process through this model consists of four steps: (1) extracting project information, identifying conditions prone to claim and storing them into a relational database, (2) automatically connecting the database to building information model, (3) simulation of the claims in building information model and (4) final calculations and report.Practical implicationsThe proposed model can provide benefits to parties involved in a claim, such as early identification of potential claims, large space for data storage, facilitated claim management processes, information consistency and improved collaboration.Originality/valueThere are a few studies on providing solutions to claim management based on BIM process. Hence, the original contribution of this paper is the attempt to set a link between BIM and claim management processes.
Smart and Sustainable Built Environment Market – Emerald Publishing
Published: Jun 17, 2021
Keywords: Architecture; Engineering; Construction (AEC) industry; Claim management; Hard claims; Building information modeling (BIM); Multi-dimensional simulation; Visualization
Read and print from thousands of top scholarly journals.
Already have an account? Log in
Bookmark this article. You can see your Bookmarks on your DeepDyve Library.
To save an article, log in first, or sign up for a DeepDyve account if you don’t already have one.
Copy and paste the desired citation format or use the link below to download a file formatted for EndNote
Access the full text.
Sign up today, get DeepDyve free for 14 days.
All DeepDyve websites use cookies to improve your online experience. They were placed on your computer when you launched this website. You can change your cookie settings through your browser.