Post-contract material management and waste minimization

Post-contract material management and waste minimization This paper aims to assess the level of awareness of quantity surveyors in material management and their key roles in waste minimization during the post-contract stage of the project with a view of achieving value for money in their roles.Design/methodology/approachThis involves administering a questionnaire survey to registered members of the Nigerian Institute of Quantity Surveyors, the only recognized professional body of quantity surveyors in Nigeria, within Lagos state. The empirical questionnaire survey succeeds a literature review that isolates the key strategies used by quantity surveyors in material management and waste minimization at the post-contract stage. The validity of the questionnaire was carried out by two experienced construction industry researchers and three experienced professional quantity surveyors to ensure that the questionnaire was not ambiguous and that it consists of the right questions in tandem with the research. The respondents were grouped into consultant’s QS and contractor’s QS.FindingsKey roles of quantity surveyors during the material management process are proper material storage, and material inventory and accounting are the most important material management and waste minimization practices during the institute stage. It revealed that there is a lack of material waste documentation practices during the construction stage. In addition, there is no statistically significant difference in the responses of the two groups. This may be because there is no clear compartmentalization between the practices of the two groups. In addition, these two groups had the same education training, as there is no difference between the educational training of the consultant’s QS and contractor’s QS.Originality/valueThis study assessed the quantity surveyors’ roles with regard to material management and waste minimization. It would add to the scanty research work in this area. The study has also successfully revealed the strategies that are to be adopted by the quantity surveyors to achieve value for money during the post-contract stage. http://www.deepdyve.com/assets/images/DeepDyve-Logo-lg.png Journal of Engineering Design and Technology Emerald Publishing

Loading next page...
 
/lp/emerald-publishing/post-contract-material-management-and-waste-minimization-vld6IjS30d

References (47)

Publisher
Emerald Publishing
Copyright
© Emerald Publishing Limited
ISSN
1726-0531
DOI
10.1108/jedt-10-2018-0193
Publisher site
See Article on Publisher Site

Abstract

This paper aims to assess the level of awareness of quantity surveyors in material management and their key roles in waste minimization during the post-contract stage of the project with a view of achieving value for money in their roles.Design/methodology/approachThis involves administering a questionnaire survey to registered members of the Nigerian Institute of Quantity Surveyors, the only recognized professional body of quantity surveyors in Nigeria, within Lagos state. The empirical questionnaire survey succeeds a literature review that isolates the key strategies used by quantity surveyors in material management and waste minimization at the post-contract stage. The validity of the questionnaire was carried out by two experienced construction industry researchers and three experienced professional quantity surveyors to ensure that the questionnaire was not ambiguous and that it consists of the right questions in tandem with the research. The respondents were grouped into consultant’s QS and contractor’s QS.FindingsKey roles of quantity surveyors during the material management process are proper material storage, and material inventory and accounting are the most important material management and waste minimization practices during the institute stage. It revealed that there is a lack of material waste documentation practices during the construction stage. In addition, there is no statistically significant difference in the responses of the two groups. This may be because there is no clear compartmentalization between the practices of the two groups. In addition, these two groups had the same education training, as there is no difference between the educational training of the consultant’s QS and contractor’s QS.Originality/valueThis study assessed the quantity surveyors’ roles with regard to material management and waste minimization. It would add to the scanty research work in this area. The study has also successfully revealed the strategies that are to be adopted by the quantity surveyors to achieve value for money during the post-contract stage.

Journal

Journal of Engineering Design and TechnologyEmerald Publishing

Published: Aug 5, 2019

Keywords: Construction project management; Waste minimization; Material management; Post-contract; Quantity surveyors