Implementing CIMS in Shenyang Blower Works

Implementing CIMS in Shenyang Blower Works Computer-integrated manufacturing (CIM) has been paid serious attention in most of the industrialized countries. Shenyang Blower Works (SBW), the largest enterprise developing, designing and fabricating turbine compressors, blowers and large fans in China, made its production plan according to orders due to its single or small batch production mode. For this SBW decided to adopt the CIM philosophy and build CIM systems (CIMS) to increase the enterprise's market competitiveness. SBW has begun to develop CIMS going through the steps of feasibility study, primary design, detailed design and a partial implementation-breakthrough project since 1990. A relatively perfect computer support environment for the computer-integrated manufacturing system in Shenyang Blower Works (SB-CIMS), especially for the primary integrated application software systems, has been completed. This accounted for various economic benefits. http://www.deepdyve.com/assets/images/DeepDyve-Logo-lg.png Integrated Manufacturing Systems Emerald Publishing

Implementing CIMS in Shenyang Blower Works

Loading next page...
 
/lp/emerald-publishing/implementing-cims-in-shenyang-blower-works-D0jAuHAENN

References (4)

Publisher
Emerald Publishing
Copyright
Copyright © 1999 MCB UP Ltd. All rights reserved.
ISSN
0957-6061
DOI
10.1108/09576069910257554
Publisher site
See Article on Publisher Site

Abstract

Computer-integrated manufacturing (CIM) has been paid serious attention in most of the industrialized countries. Shenyang Blower Works (SBW), the largest enterprise developing, designing and fabricating turbine compressors, blowers and large fans in China, made its production plan according to orders due to its single or small batch production mode. For this SBW decided to adopt the CIM philosophy and build CIM systems (CIMS) to increase the enterprise's market competitiveness. SBW has begun to develop CIMS going through the steps of feasibility study, primary design, detailed design and a partial implementation-breakthrough project since 1990. A relatively perfect computer support environment for the computer-integrated manufacturing system in Shenyang Blower Works (SB-CIMS), especially for the primary integrated application software systems, has been completed. This accounted for various economic benefits.

Journal

Integrated Manufacturing SystemsEmerald Publishing

Published: Apr 1, 1999

Keywords: Computer‐integrated manufacturing; Design; Manufacturing