STUDENTS' PAPER. TIMBERING IN THE AMPTHILL SECOND TUNNEL. (INCLUDING PLATE AT BACK OF VOLUME). (ABRIDGED). | Minutes of the Proceedings of the Institution of Civil Engineers | DeepDyve